23-12-96
Dear Hugh,
I hope you had an opportunity to
go thru my earlier notes.
As mentioned earlier, there are 2
ways of going about our task of “deciphering” scanned bio-datas.
#1 - STORAGE METHOD
Create and store massive
directories of words in computer-memory. As the software picks-up each word (while
scanning/OCR), it compares it with the stored "directories", finds a
"correspondence" and stores it accordingly.
This is what RESUMIX seems to
have done with 50,000 words directory.
In next few pages, I have listed
- categories of words
- some examples.
But, the problem is to manually compile
such directories. It may take months!
#2 - AI METHOD
Under this method, we begin with
- a rudimentary "logic" (grammar)
- a small list of words' categories
- Theory of probability
( frequency - and by deduction, the
probability - of occurrence of any given word
- "before" another word
- "after" " "
The trick is to write a software which
is self-learning!
It is like providing a small nucleus
around which, gradually a PEARL is cultured!
In following pages, I have attempted
to establish a CONTEXT of words, by picking actual
examples from 30/40 bio-datas.
I am clueless as to how this analysis
will help you - but it may.
The "Word-Categories"
mentioned by me are not exhaustive. Please feel free to add.
In the file I sent to you
yesterday,
I had used following logic:
Step #1
Pick a word-category e.g.
"Unit/Section/Division/Branch
- Group - Dept - Project - Shop - Cell - Area - Office"
all of which mean "work
location"
Step #2
Find a list of words which fall
under this "word-category"
e.g.
- Tool Room - Mc Shop - Design cell -
Jigs & Fixture Assy - Forging
Dept - File Production
- Reebok project - Central Marketing Office
- Legal Dept - Merchant Banking Div.
- Jaipur Branch - Planning Section.
Step #3
List words (in fact phrases)
which precede these words
- Undertook training in
- Worked in
- Worked as
- Supervisor for
- Incharge of
- Looked after
- Looking after
- Joined
- Transferred to
- (I was) heading -
LOGICAL DEDUCTION
The above-mentioned phrases are the
most-likely phrases to precede any word that denotes "Dept - Section -
Unit - Branch - Div. etc. etc.
i.e. any word that denotes
a WORK-LOCATION.
The logic would improve as the sample-size
grows.
The entire process can also be reversed.
See enclosed Logic-sheets for
"WORK CO-ORDINATION ASSISTING
PREPARATION SUPERVISION."
Here you go backward from
STEP #3 -> STEP #2 ->
STEP #1
and reach similar CONCLUSIONS and
draw-up similar LOGIC-RULES.
I hope this should suffice for
the time being. Of course I will keep you informed if I come-up with any new
ideas.
Do you think, you could show us
an ALPHA version of the software in 8/10 days time?
with regards
H. K. Parekh
23-12-96
cc: Mr. Nagle.
CATEGORIES OF WORDS
INDUSTRY
COMPANY NAME
ADDRESS
CITY $\rightarrow$ List given to
Mr. Francis (STD codes)
COUNTRY $\rightarrow$ "
" " " (ISD codes)
MANUFACTURING - RELATED
- Manufacturing Processes/Techniques
- Mfg-related " "
- Mfg- Departments
- Equipment - Machinery - Systems
- Raw Materials / Intermediates
- End Products / Services
MANAGEMENT - RELATED
- Management Functions
- " Processes
- " Techniques
- " Documents
- " Systems
- " Procedures
- " Designations
CATEGORIES OF WORDS (CONT)
ENGINEERING RELATED
- Engineering Techniques
- " Technologies
- " Standards & Codes
- " Processes
INFORMATION - TECHNOLOGY
RELATED
- Computer Hardware
- " Software
- " Systems
- Telecommunication
INDUSTRY-NAMES
Publishing
Insurance
Travel
Tourism
Entertainment
Software
COMPANY-NAMES
This list is under preparation
and I expect to hand it over to
Mr. Francis by 1st Jan 1997. This
will contain about 700/800 names
to begin with. It will be
gradually
expanded.
INDUSTRY-NAMES
A list containing
"Industry-names"
(Some 100 odd names) has already
been given to Mr. Francis. This
may
be good enough to start with.
MANUFACTURING PROCESSES
Fabrication
Pipe Fabrication
Galvanize
Welding
Pickling
Slitting
Rewinding
Multiblanking
Annealing
To manually prepare lists of
"Mfg. Related" words
(processes / techniques /
depts / eqpt. / machinery /
systems / raw
materials / intermediates / end
products /
services etc)
is a herculean task!
Manually, this may take weeks or
even months.
It is possible that these lists
(in some form or other) exist in
- printed directories or
- CD-ROM'S or
- Internet (if we can download)
If we cannot find
quick-simple-cheap
ways of creating directories of
"MFG. -
RELATED" words, let us just
ignore
such words!! or put them all
under
an omnibus "CATEGORY"
called,
KEYWORDS!
MFG. RELATED PROCESSES
Handling
Material Handling
Transporting
<pre> 12 MANUFACTURING -
DEPARTMENTS
Machine Shop Tool Room.
</pre>
<pre> 13 EQUIPMENT -
MACHINERY - SYSTEMS
- Industrial Burners
- Combustion Equipment
- Cement Kiln Pressure Vessels Storage
Tanks LPG Bottling Plant Heat Exchangers Condensers
Structural Fabrication Material Handling Eqpt. Conveyors
Vibratory Feeders Cranes Ferron Hydraulic
Equipment Hydraulic Cylinders Power-pack Industrial
Fans " Pumps MCC. PLC Panels / PLC Offshore
Structures Process Platforms. Valves Compressors Pumps
Separators Manifolds Vessels Jacket Main
Deck Heli Deck
Jack-up Rig Heavy Lifts
DMT Plant Columns Tanks Piping Paraxylene Plant
Cold Rolling Mill D.C. Drives Control System A.C. Motor Roll
Grinder Diesel Generator EOT Crane Motor Control Centres
Continuous Billet Caster Electric Substations Vacuum Circuit
Breakers Battery Chargers Mechanical Systems **Hydraulic
" ** **Electro-mechanical " ** **Pneumatic " ** Coal Handling
Plant Thermal Power Station **Hydraulic " ** Ash Handling
Plant Fuel Oil Handling System. </pre>
<pre> 14 RAW MATERIALS
Ferrous Castings Non-Ferrous
" Refractory Materials CS AS SS NACE
CU-NI </pre>
<pre> 15 MANAGEMENT
FUNCTIONS
Personnel " &
Administration Administration HRD HRM Welfare Finance
Sales Marketing Distribution Public Relations (Govt)
Liaison Business Development Purchase (New) Product
Development Planning Costing
A list containing names of
"Management functions" (FUNCTIONS) has been handed over to Mr.
Francis. This should suffice for the time- being. Also for the time-being, let
us club "Management-Processes" and "Mgmt. Techniques" under
FUNCTIONS only to simplify matters. </pre>
<pre> 16 MANAGEMENT -
PROCESS
- Recruitment
- Performance Appraisal
- Potential "
- Conflict Resolution
- Wage Settlement
- Disciplinary Action
- Productivity Agreement Budgetting Hiring
Verification. </pre>
<pre> 17 MANAGEMENT
TECHNIQUES
Manpower Planning Material
Planning Work " Facilities " Computerised "
Trouble shooting Decision Making Computerisation Job
Planning Job Allocation Human Resource Administration. Programming
Project Planning " Scheduling " Monitoring "
Execution Technical Evaluation of Bids. Negotiations Schedule
Monitoring. Training Compensation Planning Succession
" Franchising. </pre>
<pre> 18 MANAGEMENT -
DOCUMENTS
- Procedure Manual Contract Works
Order Invoice Bill Gate-Pass Credit Note Debit
Note Register Drawing Tender Purchase Order
Stores Credit Note Letter Of Credit Test Certificate Inspection
Report Bill Of Material Progress Report Bar Bending
Schedule Schedule Offer MIS Report Construction
Schedule PERT chart Bar chart Pre chart.
This list can be enlarged
gradually by-studying-interpreting daily computer (AI Software) printout
which says, "While scanning I could not figure-out following words".
Please HELP. </pre>
<pre> 19 ENGINEERING
TECHNIQUES
Erection Installation
Commissioning Ship Repair Ship Building Testing NDT
(Non destructive Testing) Pre-commissioning X-Ray MPI D
& P. Test UST Visual Inspection Hook-Up. Maintenance
Basic Engineering Detailed " Design Calculations G.A.
Drawings Layout " Control Logic Operation.
The situation with "ENG.
RELATED" words is similar to "MFG-RELATED" words viz. HERCULEAN!
If not available on INTERNET for downloading, we will need to develop
these directories over a period of time by asking HUMAN EXPERTS to go
thru daily "I DON'T UNDERSTAND" list given by AI Software.
</pre>
<pre> 20 (ENGINEERING ?)
TECHNOLOGIES
Arcnet Technology Modem
" </pre>
<pre> 21 (ENGINEERING ?)
INTERNATIONAL STANDARDS & CODES
ASME ANSI B P
API AWS ISO 9002 TEMA ISI BS
</pre>
LOGIC - SHEET - WORK.
|
Following Phrases are
likely to be followed by |
Following words |
All of which denote/Signify |
|
Working With |
Consolidated Contractors |
Name of Company |
|
Working as |
Q.C. Lead Inspector |
Designation |
|
Worked as |
Mgmt. Trainee |
" |
|
Worked in |
Mazagaon Dock Ltd. |
Name of Company |
|
(I have) Worked as |
Dimension Controller |
Designation |
|
" " |
Project Executor |
" |
|
(Presently) Working in |
Special Steel Ltd. |
Name of Company |
|
Working as |
Sectional Head |
Designation |
|
Worked as |
Chief Coordinator |
" |
|
" " |
Shift in charge |
" |
|
" " |
Internal Auditor |
" |
|
" " |
Member of |
" |
|
Working in |
NTPC |
Name of Co. |
|
Work involves |
Preparation of tech
Specification. |
Eng. - Technique |
|
Working Under |
Senior Manager |
Designation |
|
Worked in |
Mech. Design dept. |
Department |
|
(I have) Worked as |
Project Executor |
Designation |
|
CONCLUSION ? |
||
|
- "Work" is
followed by |
- Name of Co. |
|
|
- " " " Dept. |
||
|
- " " "
Designation |
To substantiate (this
conclusion), we need a sample-size of 1000 such phrases.
LOGIC - SHEET - CO-ORDINATION
|
Following Phrases are
likely to be followed by |
Following words |
All of which denote/Signify |
|
Coordination of |
Project Activities |
|
|
Coordination with |
Customers/Consultants |
|
|
" " |
Factory Sites |
|
|
" " |
Clients |
|
|
Coordinate with |
World Bank. |
|
|
Coordination of |
rural activities |
|
|
Coordinate with |
District Collector |
|
|
</pre> |
LOGIC - SHEET - ASSISTING
|
Following Phrases are
likely to be followed by |
Following words |
All of which denote/Signify |
|
Assisting in |
Preparation of P & I
dia. |
|
|
Assisting for |
Material Estimation |
|
|
Assisting in |
- Estimation |
|
|
- Preparation of offer |
||
|
- checking |
||
|
- drawing out Specs. |
||
|
- monitoring |
||
|
- internal Coordination |
||
|
</pre> |
LOGIC - SHEET - PREPARATION
SUPERVISION.
|
Following Phrases are
likely to be followed by |
Following words |
All of which denote/Signify |
|
Preparation of |
- Eqpt. Specification |
|
|
" |
- Purchase Requisition |
|
|
" |
- Quality Documentation |
|
|
" |
- Requisitions |
|
|
" |
- Technical bid |
|
|
" |
- Engineering Layouts |
|
|
Supervision of |
house-keeping |
|
|
Supervising |
The movement of Vehicles. |
|
|
" |
Safety arrangement |
|
|
Supervision of |
Installations |
|
|
</pre> |
ANALYSIS - SHEET
|
Phrase |
Followers (Following Words) |
What do
"followers" mean? |
|
Monitoring of |
Project Execution |
|
|
Assisting in |
Preparation of P&I dia,
GA, detail Fabri. drwgs |
|
|
Coordination of |
Project activities |
|
|
with - - - - dept. |
||
|
Coordination with |
Customers, Consultants |
|
|
Subcontracting of |
Fabrication jobs |
|
|
Inspection of |
bought-out items |
|
|
Planning of |
projects |
|
|
Execution of |
" |
|
|
Control of |
" |
|
|
Assisting for |
Material Estimation |
|
|
Preparation of |
Equipment Specifications |
|
|
" |
Purchase Requisition |
|
|
" |
Quality documentation |
|
|
Coordination with |
Factory Sites |
|
|
" |
Clients |
|
|
</pre> |
ANALYSIS - SHEET
|
Phrase |
Followers (Following Words) |
What do
"followers" mean? |
|
Techno-commercial evaluation
of |
Sub-Vendors |
|
|
Period Visit to |
Sites |
|
|
Assisting in |
- Estimation |
|
|
- Preparation of offers |
||
|
- checking plants |
||
|
eqpt. layouts |
||
|
- drawing out Specifi- |
||
|
cations |
||
|
- monitoring the project |
||
|
- internal Coordination |
||
|
Working with |
Consolidated Contractors |
|
|
Working as |
Quality Control Lead
Inspector |
|
|
Worked as |
Management Trainee |
|
|
Worked in |
Mazagaon Docks Ltd |
|
|
I have joined |
" |
|
|
Promoted as |
Senior Engineer |
|
|
</pre> |
ANALYSIS - SHEET
|
Phrase |
Followers (Following Words) |
What do
"followers" mean? |
|
I am looking After following
- |
- shop floor Q.C. Work |
|
|
- Field Q.C. " |
||
|
- Review of clarity |
||
|
Welding report |
||
|
- Making NDT plan |
||
|
- Material identification |
||
|
- Weld fitup check |
||
|
- Final Weld Visual check |
||
|
- Welding monitoring |
||
|
- Dimension check |
||
|
- Final spool clearance |
||
|
I have worked as |
Dimension Controller |
|
|
I have fair Knowledge of |
NDT techniques |
|
|
I am familiar with - - |
Preparation of NDT drawings |
|
|
I have done |
hook-up & modification |
|
|
work of piping |
||
|
" " |
Computerised Planning |
|
|
</pre> |
ANALYSIS - SHEET
|
Phrase |
Followers (Following Words) |
What do
"followers" mean? |
|
I have fair Knowledge of |
Heavy Lifts with heavy-duty
Cranes |
|
|
I have worked as |
Project Executor |
|
|
Presently working in |
Special Steels Ltd. |
|
|
Working as |
Sectional Head |
|
|
worked as |
Chief Coordinator |
|
|
" " |
Shift In Charge |
|
|
" " |
Internal Auditor |
|
|
" " |
Member of - - - |
|
|
Involved with |
M/s Siemens |
|
|
I am working in |
NTPC |
|
|
I am associated with |
Project Engg. Division |
|
|
In the capacity of |
Chief Design Engineer |
|
|
Looking after |
design & engineering |
|
|
My work involves |
Preparation of tech.
specifications |
|
|
</pre> |
ANALYSIS - SHEET
|
Phrase |
Followers (Following Words) |
What do
"followers" mean? |
|
Employment at |
Kamani Tubes Ltd |
|
|
Position held in |
BASF |
|
|
Worked for |
M/s VIN (P) LTD |
|
|
Supervision of |
house-keeping |
|
|
Liasoning with |
Contractor |
|
|
Passing of |
Bills |
|
|
Looking after |
Company Vehicles |
|
|
Supervising |
the movement of vehicles. |
|
|
Allocation of |
- Vehicles/Guards |
|
|
Supervising |
Security arrangement |
|
|
Preparation of |
requisitions |
|
|
Working under |
Senior Manager |
|
|
Coordinate with |
World Bank |
|
|
</pre> |
ANALYSIS - SHEET
|
Phrase |
Followers (Following Words) |
What do
"followers" mean? |
|
Coordination of |
rural activities |
|
|
Faculty Member for |
training employees |
|
|
Coordinate with |
District Collector |
|
|
Diploma in |
Electrical Engineering |
|
|
MBA from |
IGNOU |
|
|
Responsible for |
Sales of high KVA UPS |
|
|
" " |
Customer Support |
|
|
" " |
Marketing of Filters |
|
|
" " |
Sales of Motors. |
|
|
" " |
Market Penetration |
|
|
Involved in |
business of elec. eqpt. |
|
|
" " |
interactions with - - - |
|
|
Opening of |
new distribution channel |
|
|
In Charge of |
total manufacturing |
|
|
Responsible for |
various activities |
|
|
Training in |
various departments |
|
|
</pre> |
Scan_0031.jpg
|
Phrase |
Followers (Following Words) |
What do
"followers" mean? |
|
Responsible for |
implementing projects |
|
|
Liaison with |
clients/suppliers |
|
|
Involved in |
execution of projects. |
|
|
In capacity of |
Senior Engineer |
|
|
Was also earlier involved in |
following projects |
|
|
Visited |
Frankfurt |
|
|
" |
Baroda Site |
|
|
Meeting with |
Clients/Contractors |
|
|
Underwent training in |
the inspection department |
|
|
Worked in |
Mech. design dept. |
|
|
Had the exposure in |
preparation of order
specifications. |
|
|
Checking of |
Vendor Drawings |
|
|
Preparation of |
technical bid |
|
|
Was deputed to |
J.K. Synthetics |
|
|
" for |
erection of eqpt. |
|
|
Was also involved in |
Site modification |
|
|
</pre> |
ANALYSIS - SHEET
|
Phrase |
Followers (Following Words) |
What do
"followers" mean? |
|
Since 1984 with |
Herdillia Chem. Ltd. |
|
|
Having collaboration with |
Hercules of USA |
|
|
Heading |
Project execution Section |
|
|
" |
Civil Construction |
|
|
" |
detailed engineering |
|
|
" |
inspection activities. |
|
|
Hands-on experience in |
all phases of project
management |
|
|
Conversant with |
methods & procedures |
|
|
Inspection of |
plant equipment |
|
|
to meet |
statutory requirement |
|
|
Issue of tender for |
Civil Work |
|
|
Installation of |
Water System |
|
|
Simulation of |
PAT Pump System |
|
|
Exposure to |
plant maintenance |
|
|
Knowledge on |
plant Buildings. |
|
|
Involvement in |
ISO 9000 Certification |
|
|
Awareness of |
PC & Computer usage |
|
|
Presently heading |
the Section |
|
|
Services for |
plant improvement schemes |
|
|
</pre> |
ANALYSIS - SHEET
|
Phrase |
Followers (Following Words) |
What do
"followers" mean? |
|
11 years 9 months in |
Steel Plant division |
|
|
I was holding the position
of |
Asst. Manager (Projects) |
|
|
I am presently holding the
position of |
Manager (Projects) |
|
|
Preparation of |
engineering layouts. |
|
|
Selection of |
appropriate equipments |
|
|
Liaison with |
procurement division |
|
|
Supervision of |
installation |
|
|
Scheduling & monitoring
of |
projects |
|
|
Controlling of |
projects. |
|
|
List of |
major projects |
|
|
Carried-out by |
BBC |
|
|
Consultants for the project
were |
TCE |
|
|
Augmentation &
Upgradation of |
downstream steel making |
|
|
Upgradation of |
arc furnace. |
|
|
Conversion of |
Fuel oil System |
|
|
Joint Venture with |
M/s Kalyani steel Ltd. |
|
|
Budget is |
Rs. 1500 cr. |
|
|
</pre> |
WHAT IS THE NATURE OF THE WORDS
THAT PRECEDE ?
|
WHAT IS THE NATURE OF THE
WORDS THAT PRECEDE ? |
WORDS THAT PRECEDE |
PREPOSITION |
WORDS THAT FOLLOW |
WHAT IS THE NATURE OF THE
WORDS THAT FOLLOW ? |
|
Activity |
Monitoring |
of |
Project execution |
Function |
|
" |
Assisting |
in |
Preparation of P&I dia. |
Eng. Technique |
|
Mgmt. Process |
Co-ordination |
with |
Project activities |
Mgmt- Process |
|
" |
Sub-contracting |
for |
Customers/Consultants |
Common noun |
|
Eng. Technique |
Inspection |
to |
Fabrication Jobs |
Mfg. Process |
|
Mgmt. Process |
Planning |
as |
bought-out items |
Eqpt. |
|
" |
Execution |
after |
Projects |
Mgmt process |
|
" |
Control |
at |
Material Estimation |
" Technique. |
|
Activity |
Preparation |
under |
Equipment Specification |
Eng. Technique. |
|
" |
Co-ordination - Coordinate |
from |
Purchase requisition |
Document |
|
" |
Evaluation |
on |
Quality documentation |
" |
|
Activity |
Visit |
by |
Factory Sites |
Location |
|
" |
Working - Worked |
Over |
Clients |
Common noun |
|
" |
Promoted |
Above |
Sub-Vendors |
" |
|
" |
Looking |
Sites |
Location. |
|
|
Knowledge |
Estimation |
Mgmt- Technique |
||
|
" |
Familiar |
Preparation of offers |
Mgmt- Process |
|
|
" |
Involved - Involvement |
Checking plant & eqpt. |
" " |
|
|
" |
Associated |
drawing out specifications |
" " |
|
|
" |
Capacity |
monitoring the project |
" " |
|
|
Mgmt. Process |
Employment |
Internal Coordination |
" " |
|
|
" |
Held |
Consolidated Contractors |
Common Noun. |
|
|
" |
Supervision - Supervising |
Q.C. Lead Inspector |
Designation. |
|
|
" |
Liasoning - Liason |
Management Trainee |
" |
|
|
" |
Passing |
Mazagaon Docks Ltd |
Company Name |
|
|
" |
Allocation |
Senior Engineer |
Designation |
|
|
" |
Member |
Shop-floor Q.C. Work |
Mgmt- Process |
|
|
Education Qual. |
Diploma |
Review of |
" Technique |
|
|
" |
MBA |
Making NDT plan |
" " |
|
|
</pre> |
WHAT IS THE NATURE OF THE WORDS
THAT PRECEDE ?
|
WHAT IS THE NATURE OF THE
WORDS THAT PRECEDE ? |
WORDS THAT PRECEDE |
PREPOSITION |
WORDS THAT FOLLOW |
WHAT IS THE NATURE OF THE
WORDS THAT FOLLOW ? |
|
Activity |
Responsible |
Material identification |
Mgmt- Technique |
|
|
" |
Opening |
Weld fitup check |
Eng. |
|
|
Designation |
In-charge |
Dimension Controller |
Designation. |
|
|
Mgmt. Technique |
Training |
hook-up & modification |
Eng. Technique. |
|
|
" |
In Capacity |
Computerised planning |
Mgmt. |
|
|
Activity |
Meeting |
Heavy Lifts |
Eqpt. |
|
|
" |
Exposure |
Project Executor |
Designation. |
|
|
" |
Checking |
Sectional Head |
" |
|
|
Mgmt. Process |
Deputed |
Chief Coordinator |
" |
|
|
" |
Collaboration |
Shift-in-charge |
" |
|
|
" |
Experience |
Member of |
? |
|
|
" |
Conversant |
Project Engg. Division |
Dept. |
|
|
" |
To meet |
Design & Engineering |
Eng. Technique |
|
|
" |
Issue |
Preparation of tech. specs |
Mgmt Technique |
|
|
Document |
Tender |
House-keeping |
" |
|
|
Eng. Technique |
Installation |
Contractor |
Common Noun |
|
|
" |
Simulation |
Bills |
Document |
|
|
" |
Awareness |
Company Vehicles. |
Eqpt. |
|
|
" |
Services |
the movement of |
Mfg. related Process |
|
|
" |
Position |
Security arrangement |
" |
|
|
Process. |
Selection. |
Requisitions |
Document. |
|
|
Activity |
Requisitions |
World Bank |
Organisation. |
|
|
" |
Scheduling |
Rural activities |
Activity. |
|
|
" |
Monitoring |
Training employees |
Mgmt. activity |
|
|
Document |
Controlling |
District Collector |
Designation. |
|
|
" |
List |
Electrical Engineering |
Educational discipline |
|
|
Activity |
Carried-out |
IGNOU |
Name of University |
|
|
Common Noun (Mgmt ?) |
Consultant |
Sales of UPS. |
Function |
|
|
Process |
Augmentation |
Customer Support |
" |
|
|
" |
Upgradation |
|||
|
</pre> |
GRAMMAR
ARTICLES:
THE, AN, A
VERBS
BE / TO BE / BEEN / HAVE BEEN
HAS BEEN
HAD BEEN
AM - ARE
IS - WAS - WERE
HAVE - HAVING - HAD.
CAN - COULD
SHALL - SHOULD
WILL - WOULD
DO - DONE
PREPOSITIONS
OF
IN
WITH
FOR
TO
AS
AFTER
AT
UNDER
OVER.
FROM
ON
ABOVE
BY




































No comments:
Post a Comment