CATEGORIES OF WORDS
- INDUSTRY
- COMPANY
NAME
- ADDRESS
- CITY
List given to Mr. Francis (STD codes)
- COUNTRY
" " " " " (ISD codes)
MANUFACTURING – RELATED
- Manufacturing
Processes / Techniques
- Mfg.
related " " Departments
- Equipment
– Machinery – Systems
- Raw
Materials / Intermediates
- End
Products / Services.
MANAGEMENT – RELATED
- Management
Functions
- "
Processes
- "
Techniques
- "
Documents
- "
Systems
- "
Procedures
- "
Designations
CATEGORIES OF WORDS (CONT.)
AN INDIVIDUAL / PERSON RELATED
- Name
- Knowledge
- Skill
- Attitude
- Attribute
- Edu.
Qualification
- Personal
data
- Salary
- Employer
- Address
- PEN
- Languages
- Designation
SOCIETY – RELATED
- LAWS
- Names
of Govt. Depts / Bodies / PSU
INDUSTRY-NAMES
- Publishing
- Insurance
- Travel
- Tourism
- Entertainment
- Software
COMPANY-NAMES
This list is under preparation and I expect to hand it over
to Mr. Francis by Jan. 1997. This will contain about names to begin with. It
will be gradually expanded.
INDUSTRY-NAMES
A list containing "Industry-names" (some odd
names) has already been given to Mr. Francis. This may be good enough to start
with.
MANUFACTURING PROCESSES
- Fabrication
- Pipe
Fabrication
- Galvanize
- Welding
- Pickling
- Slitting
- Rewinding
- Multi
Blanking
- Annealing
To manually prepare lists of "Mfg. Related" words
(processes / techniques / depts / eqpt. / machinery / systems / raw materials /
intermediates / end products / services etc) is a herculean task! Manually,
this may take weeks or even months. It is possible that these lists (in some
form or other) exist in printed directories or CD-ROMs or Internet (if we can
download).
If we cannot find quick-simple-cheap ways of creating
directories of "MFG. – RELATED" words, let us just ignore such words
!! or put them all under an omnibus "category" called, KEYWORDS!
MFG. RELATED PROCESSES
- Handling
- Material
Handling
- Transporting
MANUFACTURING – DEPARTMENTS
- Machine
Shop
- Tool
Room
EQUIPMENT – MACHINERY – SYSTEMS
- Industrial
Burners
- Combustion
Equipment
- Cement
kiln
- Pressure
Vessels
- Storage
Tanks
- LPG
Bottling Plant
- Heat
Exchangers
- Condensors
- Structural
Fabrication
- Material
Handling Eqpt.
- Conveyors
- Vibratory
Feeders
- Cranes
- Fennon
- Hydraulic
Equipment
- Hydraulic
Cylinders
- Power-pack
- Industrial
Fans
- "
Pumps
- MCC
- PLC
Panels / PLC
- Offshore
Structures
- Process
Platforms
- Valves
- Compressors
- Pumps
- Separators
- Manifolds
- Vessels
- Jacket
- Main
Deck
- Heli
Deck
- Jack-up
Rig
- Heavy
Lifts
- DMT
Plant
- Columns
- Tanks
- Piping
- Paraxylene
Plant
- Cold
Rolling Mill
- D.C.
Drives Control System
- A.C.
Motor
- Roll
Grinder
- Diesel
Generator
- EOT
Crane
- Motor
Control Centres
- Continuous
Billet Caster
- Electric
Substations
- Vacuum
Circuit Breakers
- Battery
Chargers
- Mechanical
Systems
- Hydraulic
"
- Electro-mechanical
"
- Pneumatic
"
- Coal
Handling Plant
- Thermal
Power Station
- Hydraulic
"
- Ash
Handling Plant
- Fuel
Oil Handling System.
RAW MATERIALS
- Ferrous
Castings
- Non-Ferrous
"
- Refractory
Materials
- CS
- AS
- SS
- NACE
- CU-NI
MANAGEMENT FUNCTIONS
- Personnel
- "
& Administration
- Administration
- HRD
- HRM
- Welfare
- Finance
- Sales
- Marketing
- Distribution
- Public
Relations
- (Govt.)
Liaison
- Business
Development
- Purchase
- (New)
Product Development
- Planning
- Costing
A list containing names of "Management functions"
(FUNCTIONS) has been handed over to Mr. Francis. This should suffice for the
time-being: Also for the time-being, let us club "Management –
Processes" and Mgmt. "Techniques" under FUNCTIONS only to
simplify matters.
ANALYSIS – SHEET
|
Phrase |
Followers (Following Words) |
What do "followers" mean? |
|
Monitoring of |
Project Execution |
|
|
$\checkmark$ Assisting in |
Preparation of P&I dia, GA, detail fabri. dwgs |
|
|
$\checkmark$ Coordination of |
Project activities with - - - - dept. |
|
|
$\checkmark$ Coordination with |
Customers, consultants |
|
|
Subcontracting of |
Fabrication jobs |
|
|
Inspection of |
bought-out items |
|
|
Planning of |
projects |
|
|
Execution of |
" |
|
|
Control of |
" |
|
|
$\checkmark$ Assisting for |
Material Estimation |
|
|
$\checkmark$ Preparation of |
– Equipment Specifications |
|
|
$\checkmark$ " |
– Purchase Requisition |
|
|
$\checkmark$ " |
– Quality documentation |
|
|
$\checkmark$ Coordination with |
– Factory Sites |
|
|
$\checkmark$ " |
– Clients |
ANALYSIS – SHEET
|
Phrase |
Followers (Following Words) |
What do "followers" mean? |
|
Techno-commercial evaluation of |
Sub-Vendors |
|
|
Period Visit to |
Sites |
|
|
$\checkmark$ Assisting in |
– Estimation |
|
|
– Preparation of offers |
||
|
– checking plant & eqpt. layouts |
||
|
– drawing out specifications |
||
|
– monitoring the project |
||
|
– Internal coordination |
||
|
$\checkmark$ Working with |
Consolidated Contractors |
|
|
$\checkmark$ Working as |
Quality Control Lead Inspector |
|
|
$\checkmark$ Worked as |
Management Trainee |
|
|
$\checkmark$ Worked in |
Mazgaon Docks Ltd |
|
|
I have joined |
" " |
|
|
Promoted as |
Senior Engineer |
ANALYSIS – SHEET
|
Phrase |
Followers (Following Words) |
What do "followers" mean? |
|
I am looking after following |
– shop floor Q.C. work |
|
|
– Field Q.C. " |
||
|
– Review of daily Welding report |
||
|
– Making NDT plan |
||
|
– Material identification |
||
|
– Weld fitup check |
||
|
– Final Weld visual check |
||
|
– Welding monitoring |
||
|
– Dimension check |
||
|
– Final spool clearance |
||
|
$\checkmark$ I have worked as |
Dimension Controller |
|
|
I have fair Knowledge of |
NDT techniques |
|
|
I am familiar with - - - |
Preparation of NDT drawings |
|
|
I have done |
hook-up & modification work of piping |
|
|
" " |
Computerised planning |
ANALYSIS – SHEET
|
Phrase |
Followers (Following Words) |
What do "followers" mean? |
|
I have fair Knowledge of |
Heavy Lifts with heavy-duty Cranes |
|
|
$\checkmark$ I have worked as |
Project Executor |
|
|
$\checkmark$ Presently Working in |
Special Steels Ltd |
|
|
$\checkmark$ Working as |
Sectional Head |
|
|
$\checkmark$ Worked as |
Chief Coordinator |
|
|
$\checkmark$ " " |
Shift In Charge |
|
|
$\checkmark$ " " |
Internal Auditor |
|
|
$\checkmark$ " " |
Member of - - - |
|
|
Involved with |
M/s Siemens |
|
|
$\checkmark$ I am working in |
NTPC |
|
|
I am associated with |
Project Engg. Division |
|
|
In the capacity of |
Chief Design Engineer |
|
|
Looking after |
design & engineering |
|
|
$\checkmark$ My Work involves |
Preparation of tech. specifications. |
ANALYSIS – SHEET
|
Phrase |
Followers (Following Words) |
What do "followers" mean? |
|
Employment at |
Kamani Tubes Ltd. |
|
|
Position held in |
BASF |
|
|
Worked for |
M/s VIN (P) LTD |
|
|
$\checkmark$ Supervision of |
house-keeping |
|
|
Liasoning with |
Contractor |
|
|
Passing of |
Bills |
|
|
Looking after |
Company Vehicles |
|
|
$\checkmark$ Supervising |
the movement of vehicles. |
|
|
Allocation of |
– Vehicles / Guards |
|
|
$\checkmark$ Supervising |
Security arrangement |
|
|
$\checkmark$ Preparation of |
requisitions |
|
|
$\checkmark$ Working under |
Senior Manager |
|
|
$\checkmark$ Co-ordinate with |
World Bank |
ANALYSIS – SHEET
|
Phrase |
Followers (Following Words) |
What do "followers" mean? |
|
$\checkmark$ Coordination of |
rural activities |
|
|
Faculty Member for |
training employees |
|
|
$\checkmark$ Coordinate with |
District Collector |
|
|
Diploma in |
Electrical Engineering |
|
|
MBA from |
IGNOU |
|
|
Responsible for |
– Sales of high KVA UPS |
|
|
" " |
– Customer Support |
|
|
" " |
– Marketing of Batteries |
|
|
" " |
– Sales of Motors |
|
|
" " |
– Market Penetration |
|
|
Involved in |
– business of elec. eqpt. |
|
|
" " |
– interactions with - - - |
|
|
Opening of |
new distribution channel |
|
|
In Charge of |
total manufacturing |
|
|
Responsible for |
various activities |
|
|
Training in |
various departments |
ANALYSIS – SHEET
|
Phrase |
Followers (Following Words) |
What do "followers" mean? |
|
Responsible for |
implementing projects |
|
|
Liaison with |
clients / suppliers |
|
|
Involved in |
execution of projects. |
|
|
In capacity of |
Senior Engineer |
|
|
Was also earlier involved in |
following projects |
|
|
Visited |
– Frankfurt |
|
|
" |
– Banda site |
|
|
meeting with |
Clients / contractors |
|
|
Underwent training in |
the inspection department |
|
|
$\checkmark$ Worked in |
Mech. design dept. |
|
|
had the exposure in |
preparation of order & specifications. |
|
|
Checking of |
Vendor drawings. |
|
|
$\checkmark$ Preparation of |
technical bid |
|
|
Was deputed to |
J.K. Synthetics |
|
|
" " for |
erection of eqpt. |
|
|
Was also involved in |
Site modification |
ANALYSIS – SHEET
|
Phrase |
Followers (Following Words) |
What do "followers" mean? |
|
Since 1984 with |
Heredillia Chem. Ltd. |
|
|
having collaboration with |
Hercules of USA |
|
|
Heading |
– Project execution Section |
|
|
" |
– Civil Construction |
|
|
" |
– detailed engineering |
|
|
" |
– inspection activities. |
|
|
Hands-on experience in |
all phases of project management |
|
|
Conversant with |
methods & procedures |
|
|
Inspection of |
plant equipment |
|
|
to meet |
statutory requirement |
|
|
Issue of tender for |
Civil work |
|
|
Installation of |
Water system |
|
|
Simulation of |
PHT pump System |
|
|
Exposure to |
plant maintenance |
|
|
Knowledge on |
plant Buildings. |
|
|
Involvement in |
ISO 9000 certification |
|
|
Awareness of |
PC & Computer usage |
|
|
Presently heading |
the section |
|
|
Services for |
plant improvement schemes |
ANALYSIS – SHEET
|
Phrase |
Followers (Following Words) |
What do "followers" mean? |
|
11 years 9 months in |
Steel Plant division |
|
|
$\checkmark$ I was holding the position of |
Asst. Manager (Projects) |
|
|
$\checkmark$ I am presently holding the position of |
Manager (Projects) |
|
|
$\checkmark$ Preparation of |
engineering layouts. |
|
|
Selection of |
appropriate equipments |
|
|
Liaison with |
procurement division |
|
|
$\checkmark$ Supervision of |
installation |
|
|
Scheduling & monitoring of |
projects |
|
|
Controlling of |
projects |
|
|
List of |
main projects |
|
|
Carried-out by |
BBC |
|
|
Consultants for the project were |
TCE |
|
|
Augmentation & Upgradation of |
downstream Steel making |
|
|
Upgradation of |
arc furnace. |
|
|
Conversion of |
Fuel oil System |
|
|
Joint Venture with |
M/s Kalyani steel Ltd. |
|
|
Budget is |
Rs. 1500 cr. |
ANALYSIS – SHEET
|
WHAT IS THE NATURE OF THE WORDS THAT PRECEDE? |
WORDS THAT PRECEDE |
PREPOSITION |
WORDS THAT FOLLOW |
WHAT IS THE NATURE OF THE WORDS THAT FOLLOW? |
|
Activity |
Monitoring |
of |
Project execution |
Function |
|
" |
Assisting |
in |
Preparation of P&I dia |
Eng. Technique. |
|
Mgmt. Process |
Co-ordination |
with |
Project Activities |
Mgmt. Process |
|
" |
Sub-contracting |
for |
Customers / Consultants |
Common noun |
|
Eng. Technique |
Inspection |
to |
Fabrication jobs |
Mfg. Process |
|
Mgmt. Process |
Planning |
as |
Bought-out items |
Eqpt. |
|
" |
Execution |
after |
Projects |
Mgmt. Process |
|
" |
Control |
at |
Material Estimation |
" Technique |
|
Activity |
Preparation |
under |
Equipment Specifications |
Eng. Technique. |
|
" |
Co-ordination-coordinate |
from |
Purchase Requisition |
Document |
|
" |
" |
on |
Quality documentation |
" |
|
" |
Evaluation |
by |
Factory Sites |
Location |
|
" |
Visit |
over |
Clients |
Common noun |
|
" |
Working - Worked |
Above |
Sub-Vendors |
" " |
|
" |
Promoted |
Sites |
Location |
|
|
" |
Looking |
Estimation |
Mgmt. Technique |
|
|
Knowledge |
Preparations of offers |
Mgmt. Process |
||
|
" |
Familiar |
Checking plant & eqpt |
" " |
|
|
" |
Involved - Involvement |
Drawing out specifications |
" " |
|
|
" |
Associated |
monitoring the project |
" " |
|
|
Capacity |
Internal Coordination |
" " |
||
|
Employment |
Consolidated Contractors |
Common noun. |
||
|
Held |
Q.C. Lead Inspector |
Designation. |
||
|
Mgmt. Process |
Supervision - Supervising |
Management Trainee |
" " |
|
|
" |
Liasoning-Liaison |
Mazgaon Docks Ltd |
Company Name |
|
|
Passing |
Senior Engineer |
Designation |
||
|
Allocation |
Shop-floor Q.C. Work |
Mgmt. Process |
||
|
Member |
Review of - - - |
" Technique |
||
|
Education Quali. |
Diploma |
Making NDT plan |
" " |
|
|
" " |
MBA |
ANALYSIS – SHEET
|
WHAT IS THE NATURE OF THE WORDS THAT PRECEDE? |
WORDS THAT PRECEDE |
PREPOSITION |
WORDS THAT FOLLOW |
WHAT IS THE NATURE OF THE WORDS THAT FOLLOW? |
|
Responsible |
Material identification |
Mgmt. Technique |
||
|
Activity |
Opening |
Weld fitup check |
Eng. " |
|
|
Designation |
In-charge |
Dimension Controller |
Designation |
|
|
Mgmt. Technique |
Training |
Hookup & modification |
Eng. Technique |
|
|
In Capacity |
computerised planning |
Mgmt. " |
||
|
Activity |
Meeting |
Heavy lifts |
Eqpt. |
|
|
Exposure |
Project Executor |
Designation |
||
|
Activity |
Checking |
Sectional Head |
" |
|
|
Deputed |
Chief Coordinator |
" |
||
|
Collaboration |
shift-in-charge |
" |
||
|
Mgmt. Process |
Experience |
Member of |
? |
|
|
Conversant |
Project Engg. Division |
Dept. |
||
|
To meet |
Design & Engineering |
Eng. Technique |
||
|
Issue |
Preparation of tech-specs |
Mgmt. Technique |
||
|
Document |
Tender |
House-keeping |
" " |
|
|
Eng. Technique |
Installation |
Contractor |
Common Noun |
|
|
" " |
Simulation |
Bills |
Document |
|
|
Awareness |
Company Vehicles |
Eqpt. |
||
|
Services |
the movement of . |
Mfg-related Process |
||
|
Position |
Security arrangement |
" " |
||
|
Selection |
Requisitions |
Document |
||
|
Process. |
Scheduling |
World Bank |
Organisation |
|
|
Activity |
Monitoring |
Rural activities |
Activity |
|
|
" |
Controlling |
training employees |
Mgmt. activity |
|
|
Document |
List |
District Collector |
Designation |
|
|
Activity |
Carried-out |
Electrical Engineering |
Educational discipline |
|
|
Common Noun |
Consultant |
IGNOU |
Name of University |
|
|
(Mgmt?) Process |
Augmentation |
Sales of UPS |
Function |
|
|
" " |
Upgradation |
Customer Support |
" |
GRAMMAR
ARTICLES:
- THE,
AN, A
VERBS
- BE
/ TO BE / BEEN / HAVE BEEN
- HAS
BEEN
- HAD
BEEN
- AM
– ARE
- IS
– WAS – WERE
- HAVE
– HAVING – HAD.
- CAN
– COULD
- SHALL
– SHOULD
- WILL
– WOULD
- DO
– DONE
PREPOSITIONS
- OF
- IN
- WITH
- FOR
- TO
- AS
- AFTER
- AT
- UNDER
- OVER.
- FROM
- ON
- ABOVE
- BY
(Proposed Layout for Data Storage)
Proposed Layout for Storage of scanned/AI data into an
intermediate file
1. Name of Table:
- HMTBL1.DBF
2. Contents:
- To
store data picked up from scanned bio-datas.
3. Layout:
|
Details |
Field Name |
Num/Chr |
Len |
Dec |
|
Record Name (fixed 'HMT1') |
Recname |
C |
3 |
|
|
Library Sr. No. (Fixed '201') |
Libno |
C |
3 |
|
|
Record Status (Leave blank) |
Recstat |
N |
1 |
|
|
Executive Sr. No. |
Exsrno |
N |
8 |
|
|
Sub No. (by default 1) |
Subno |
N |
2 |
|
|
Type of Data Stored |
Typdata |
C |
10 |
|
|
Code related to data (if any,) |
Typcode |
C |
10 |
|
|
Actual description related to this data element |
Text1 |
C |
30 |
|
|
Any Numeric Data |
Numdata |
N |
12 |
4 |
|
Year of Passing an exam. (for edun. only) |
Passyr |
N |
4 |
|
|
Speak/Read/Write? Y/?(For Language only) (store Y else
blank e.g. Y/Y) |
SRW |
C |
3 |
|
|
Current Employment-Y? |
4. Type of data stored:
- Use
following codes for individual data-
|
Typ data |
Details |
|
SOURCE |
Source of Application |
|
ADREF |
Adut. Ref. |
|
BOXNO |
Box No. |
|
ESNAME |
Executive's Surname |
|
EFNAME |
First Name |
|
EMNAME |
Middle Name |
|
ESEX |
Sex |
|
EDOB |
Date of Birth stored as dd/mm/yyyy |
|
EADDR1 |
Address Line-1 |
|
EADDR2 |
-2 |
|
EADDR3 |
-3 |
|
EADDR4 |
-4 |
|
ECITY |
City of Residential address |
|
EPIN |
Pin code |
|
EPHONE |
Phone nos. separated by , |
|
EFAX |
Fax no. |
|
EHOUTYP |
Type of House C-ompany flat/O-wn |
4. Type of data stored (contd...):
|
Typ data |
Details |
|
ESAL |
Executive's Current Salary-Basic + DA |
|
ECALLOW |
-Allowances |
|
ECPERKS |
-Perks |
|
ECREIME |
-Reimbursements |
|
ECANNUAL |
-Annual benefits |
|
ECRETRE |
-Retirement benefits |
|
ECOTHER |
-Other earnings |
|
ECGROSS |
-Gross salary/annum |
|
ECRATING |
-AEE etc. rating |
|
EDUCED |
Education qualification code |
|
PASSYR |
Year of passing the exam |
|
UNIV |
University from where passed |
|
LANGCD |
Language known code |
|
SPEAKY |
Y, if can speak |
|
READY |
Y, if can read |
|
WRITEY |
Y, if can write |
|
ENCONM |
Organisation in which employed |
|
DESGNM |
Designation |
|
DESGLV |
Level of designation (between 10 to 90) |
|
STARTYM |
Employment started during yyyy-mm |
|
UPTOYM |
Employment ended during yyyy-mm |
|
CURRYMM |
Period of employment in terms of years & months |
|
STAFFNO |
No. of Staff members reporting |
|
REPON |
Responsible for (the activity... details) |
|
REPBYTO |
Reporting to (Who/Say Mr.) |
|
WHYLEFT |
Reason for leaving (descriptive) |
|
MEMBORG |
Membership organisation |
|
MEMBDESG |
Designation held there |
|
MEMBPERID |
Period of membership |
|
REFNM |
Reference Person Details - Name |
|
REFDESG |
- Designation |
|
REFADDR1 |
$\leftarrow$ Residence $\rightarrow$ - Address Line-1 |
|
REFADDR2 |
- Address Line-2 |
|
REFADDR3 |
- Address Line-3 |
|
REFADDR4 |
- Address Line-4 |
|
REFPIN |
- Pin Code |
|
REFPHONE |
- Phone Nos. separated by , |
|
REFADDRR1 |
$\leftarrow$ Office $\rightarrow$ - Address Line-1 |
|
REFADDRR2 |
- Address Line-2 |
|
REFADDRR3 |
- Address Line-3 |
|
REFADDRR4 |
- Address Line-4 |
|
REFPINR |
- Pin Code |
|
REFOPHONE |
- Phone Nos., Separated by , |
|
INDUST |
Code of Industry ) Search Parameters |
|
WORK |
Code of Function ) |
|
PRODLN |
Code for Production Line handled ) |
|
CITYC |
Code for Preferred city ) |
|
KEYW |
Keyword data ) |
|
PRCONM |
Name of Preferred Company ) |
|
COURNM |
Name of Course attended |
|
COURDUR |
Duration of Course |
|
COURCON |
Country in which the course was attended |
|
VCONTRY |
Code of Country visited (as per postal code 91-India) |
|
VPERIOD |
Period of visit |
LOGIC – SHEET
|
Following Phrases |
are likely to be followed by following words |
All of which denote/ Signify |
|
Undertook training in |
Tool Room / M-c shop Design (cell) |
A, unit Section division branch group department project
shop cell (design) Area ( office |
|
Worked (in) following (departments) |
Light Dies / Heavy Dies Jigs & fixture Asy. |
|
|
worked as Supervisor for |
Tool Room / Die Mfg. section |
|
|
In Charge [of] |
Forging Dept |
|
|
Looked after Looking after |
File production |
|
|
Worked [in] |
– Reebok Project |
|
|
– Central Mktg. office |
||
|
Joined |
Legal dept. |
|
|
Transferred To |
Merchant Banking Div. |
|
|
I was heading |
XYZ Branch |
ANALYSIS-SHEET
|
Phrase |
Followers (Following Words) |
What do followers mean? |
|
I got experience [of] |
– Submitting offer |
Mgmt. Process / Activity |
|
– To attend tender opening |
" " |
|
|
– Coordination. |
" " |
|
|
– Inspection. |
Engg. Technique |
|
|
Gained useful experience [in] |
– all chores of book-keeping |
Procedure |
|
– sales tax Formalities |
Procedure |
|
|
Undertook training [in] |
– Tool Room |
Dept. / Section / Unit / Division |
|
– Machine Shop |
" " |
|
|
– Design Cell |
" " |
|
|
Responsible for |
Production in wire rod mill |
Mfg. Process |
|
Worked as |
– Trainee Tool & Die-Maker |
Functionality / Designation |
|
– Accounts Manager |
" |
|
|
Worked following [departments] |
Light Dies, Heavy Dies, Jigs & Fixture Assembly |
Departments |
|
Worked as Supervisor for |
Tool Room & Die mfg Section |
Dept / Div / Unit / Section / Group / Project |
|
Selected & appointed as |
Technical Trainee |
Designation. |
|
In charge of |
Tang forging dept. |
Dept. |
|
Looked after Looking after. |
file production activities |
Activity / Dept / Section / Unit |
ANALYSIS-SHEET
|
Phrase |
Followers (Following Words) |
what do "followers" mean? |
|
I am working as |
Asst. Manager (Coordination) |
Designation |
|
Involved [in] |
– Product/Marketing Services |
Mgmt Process / Activity |
|
– overall activities |
||
|
Worked [in] |
– Reebok project |
Dept. / Unit / Project / Section / Div |
|
– Central Marketing office |
||
|
Key member [of] |
Retailing Team |
Group (Mgmt.) |
|
Looking after |
– Shop Operations |
Mgmt process / Activity |
|
– Merchandising |
||
|
worked temporarily [in] following areas |
– Franchise System |
Activity |
|
– Internal decoration |
Function |
|
|
– Acquisition of shops |
Process |
|
|
I have done a lot of |
Market Survey |
Activity |
|
Worked as a |
key person |
Designation. |
|
Handled |
the project independently |
|
|
Joined [as] |
– All India Sales Manager |
Designation |
|
– Branch Manager |
||
|
Promoted [as] |
– Export Manager |
Designation |
|
– Commercial Manager |
||
|
Resigned |
with effect from 5-7-94. |
date |
ANALYSIS-SHEET
|
Phrase |
Followers (Following words) |
What do "followers" mean? |
|
Joined |
the legal department |
Dept / Unit / Section / Div / Group / Project |
|
Transferred to |
the Merchant Banking division |
" " |
|
Joined as |
temporary Clerk in... |
designation |
|
Looking after |
Complete Sales |
Mgmt Process or Activity |
|
Main responsibilities are |
Sales & Collection |
Function Process Activity |
|
I was heading |
the branch at ... |
Dept / Sec / Unit / Div / Branch etc. |
|
I was catering to |
the market of Maharashtra |
Area |
|
The job involved |
Selling & Marketing |
Function Process Activity |
|
Travelled to |
Countries like Singapore, Thailand... |
Locations |
|
handling |
public issues. |
|
|
Arranging |
Foreign Currency loans |
|
|
worked for |
only five months. |
Period |
|
Maintaining |
Progress Schedule |
WORK
- (I)
Worked with – – – –
- Worked
at – – – –
- Worked
on – – – –
- (My)
Scope of work included – – – –
- I
have worked on – – – –
- Since
– – – – I have been working with – – – –
- Nature
of Work involves – – – –
- (I)
Worked with – – – – as – – – –
- I
also worked in – – – –
- "
" – – – – and was involved in – – – –
- I
have worked in – – – –
- Worked
as – – – –
- Currently
working as – – – –
- Presently
working as – – – –
- I
am working for – – – –
- I
am working with – – – –
- (I)
worked with – – – –
- I
have been working for – – – –
- I
have worked for – – – –
- The
plants/departments where I worked were – – – –
- For
more than 1 year, I was working overseas in – – – –
- I
worked on the proposals for – – – –
- Prior
to that, I was working with – – – –
- for
the first 6 years, I worked as – – – –
- I
have even worked as – – – –
- For
sometime, I worked as – – – –
- The
project-inquiries, I worked on were – – – –
- Some
of the major projects I had worked on were – – – –
- My
work has been appreciated by – – – –
- Acquired
an in-depth working experience on – – – –
- I
have experience of Working in – – – –
- The
position I am working for is – – – –
- Presently
working in – – – –
RESPONSIBLE
- (I)
was responsible for – – – –
- Responsible
for the profitable operations of – – – –
- The
responsibilities were – – – –
- Responsible
for management of projects involving – – – –
- Overall
responsibility for – – – –
- Responsible
for designing, implementing & maintaining – – – –
- Responsible
for effective handling of – – – –
- Responsible
for starting – – – –
- Responsible
for running – – – –
- Current
responsibilities include – – – –
- Job-responsibility
includes – – – –
- Responsibilities
included – – – –
- The
responsibilities include – – – –
- As
CEO responsible for – – – –
- Other
functional responsibilities are – – – –
- Key
responsibilities areas
JOB.
- The
job-profile includes – – –
- My
job used to be – – –
- The
job involves – – –
- The
job involved – – –
- My
job involved – – –
- The
job-profile covered – – –
INVOLVED.
- The
job involves – – –
- The
job INVOLVED – – –
- My
job INVOLVED – – –
- Dedicated
INVOLVEMENT in – – –
- I was
INVOLVED in – – –
- Presently
INVOLVED in – – –
- I
also worked in – – – and was INVOLVED in – – –
- I
was actively INVOLVED in – – –
- INVOLVED
with – – –
EXPERIENCE
- I have
wide process/project engineering EXPERIENCE in – – –
- Analysis
of EXPERIENCE – – –
- I am
EXPERIENCED in – – –
- EXPERIENCE
in – – –
- EXPERIENCE
of – – –
- I have
more than – – – years (of) EXPERIENCE
- Resume
of EXPERIENCE – – –
- EXPERIENCE
details – – –
- I have
experience of dealing with – – –
- Well
experienced with – – –
SERVE
- I would
like to offer my services – – –
- SERVED
with – – –
- At
present SERVING – – –
- Presently
SERVING as – – –
- Have
been providing SERVICES – – –
- SERVED
as – – –
HANDLE
- Independently
HANDLED – – –
- HANDLED
independently – – –
- I have
handled – – –
DEAL
- I had
been DEALING with – – –
LOOK-AFTER
- I LOOKED
AFTER – – –
- Presently
LOOKING-AFTER – – –
- For
more than last 5 years, I had been LOOKING-AFTER – – –
TRAIN – TRAINING.
- I have
undergone in-plant TRAINING for – – –
- I underwent
rigorous TRAINING in – – –
- TRAINING
in – – –
- I had
– – – months of in-plant TRAINING
- I was
sent to – – – for TRAINING.
IN-CHARGE
- (I)
was IN-CHARGE of – – –
I AM
- – Sure
you will find.
- – directly
reporting to – – –
- – a
diligent and intelligent person – – –
- – a
Successful professional – – –
- – aware
of the fact – – –
- – very
much interested to – – –
- – well-conversant
with – – –
- – well
aware of – – –
- – part
of – – –
- – interested
in – – –
- – proficient
in – – –
- – familiar
with – – –
- – responsible
for – – –
- – Seeking
a placement in – – –
- – responsible
for
- developing
- processing
- finalizing
- ensuring
- preparing
- Liasoning
- accounting
- budgetting
- pricing
- costing
- dealing
- auditing
- achieving
- Supervising
- leading
- motivating
- Guiding
- Formulating
- providing
- assisting
- monitoring
- recovering
- Collecting
- Scrutinizing
- Improving
I HAVE
- – prepared
- –
the ability of – – –
- – keen
interest in – – –
- – done
following projects – – –
- – turned
around the company
- – also
done
- – even
worked as.
- – more
than – – – years of experience.
- – experience
of dealing with.
- – travelled
all over India
- – done
process-design calculations
- – studied
- – Successfully
completed a project
- – participated
in
- – undergone
- – joined
the company as – – –
- – been
transferred to.
- – played
a key-role to.
- – handled
I HAD
- – additional
duty of
- – suggested
- – studied
unit operations like – – –
- –
– – months of in-plant training
- – been
dealing with.
- – worked
on – – –
- – received
appreciation letter for my work
- – Studied
I WAS
- – involved
in.
- – actively
involved in.
- – sent
to
- – associated
with
- – also
associated with.
- – alloted
(duty)
- – designated
as
- – promoted
as
- – deputed
to
- – awarded
with. – – –
- – Confirmed
as
- – absorbed
as
- – in-charge
of
- – engaged
in
- – head
of
- – main
liason between.
- – heading
– – –
- – instrumental
in
- – instrumental
for
I (Future/Modal/Passive Voice Phrases)
- would
like you to note – – –
- would
like to offer my services
- would
like to introduce myself as – – –
- shall
be highly thankful
- will
be highly obliged if – – –
- started
my career as – – –
- prepared
- represented
- Completed
my graduation in – – – from – – –
- Completed
my diploma in – – –
- Obtained
associate membership of – – –
- know
major specifications of
- can
dictate offers
- can
understand
I (Past Tense Action Verbs)
- directed
- completed
- assisted
- conducted
- co-ordinated
- developed
- documented
- taught
- procured
- produced
- lead
- designed
- implemented
- presented
- secured.
MY
- –
locational preference is
- –
main tasks were
- –
jurisdiction covered
- –
major projects were
- –
achievements were
- –
contribution was
- –
main responsibility was.
- –
range of assignments covered
- –
important duties were.
- –
experience/expertise consists of
- –
area of expertise is – –
|
My job/responsibility Was To, |
I Was responsible for |
|
Strengthen |
strengthening |
|
Provide |
providing |
|
Develop |
developing |
|
Implement |
implementing |
|
Track |
tracking |
|
Assist |
assisting |
|
Achieve |
|
|
Energise |
|
|
Conceive |
|
|
Prepare |
|
|
Monitor |
|
|
Administer |
|
|
Maintain |
|
|
Evolve |
|
|
Set up |
|
|
Generate |
|
|
Improve |
|
|
Organise |
|
|
Train |
|
|
Handle |
|
|
Guide |
|
|
Motivate |
|
|
Supervise |
|
|
Assist |
|
|
Create |
|
|
Design |
|
|
Support |
|
|
Promote |
|
|
Select |
|
|
Establish |





















































No comments:
Post a Comment