Kind Attention Mr. Neeraj Rathi
FAX:
Attn: Mr. Neeraj Rathi
Applitech
Ahmedabad
Dec. 27, 2001
Dear Neeraj:
Change Requests
I refer to the Report Formats
faxed on Dec. 25. I could not attend to this as I was extremely busy yesterday.
I have gone thru these proposals
of yours, which require minor modifications.
I enclose my counterproposals,
incorporating the changes desired. If in doubt, do send me a fax/email.
As far as
- Item # 7 (Ally wise Order Report)
- Ref. check & Regret letters
are concerned, I will send you
our drafts in 2/3 days.
With regards
H. Parikh
Enclosed:
Formats for Report Nos. 3/4/5/6/8
(Serial 15)
No: 11 (Serial 17)
cc: Mangesh (Mumbai)
cc: Mr. Sahid Sayyed
SERIAL NO: 15 / Change
Request No: 2 / Item No: 3
Dec. 27, 2001
PRELIMINARY INTERVIEWS - ORDER
WISE REPORT.
|
From (Date) |
To (Date) |
|
\text{------------} |
\text{------------} |
|
SON (Reverse Chrono) |
Client Name |
Position (Vacancy Name) |
Consultant Name |
Interview Panel |
Prelim. Interview Scheduled
Dates |
|
clickable values |
Notes
- This "SUMMARY" statement covers ALL
sales orders / ALL clients / ALL consultants.
- Clicking on any particular SON should open
up another window/screen, where, one can view Report No: 45 for
that sales order. Closing the new window would return to original screen.
- If, for any given (one) position, several
candidates are "scheduled" to be interviewed on different dates,
then, one below another, all these different dates must appear in the last
column.
SERIAL NO: 15 / Change Req
st No: 2 / Item No: 4
Dec. 27, 2001
PRELIMINARY INTERVIEWS -
PARENT GROUP WISE REPORT
|
From (Date) |
To (Date) |
|
\text{------------} |
\text{------------} |
|
Parent Group Name |
clickable on a dropdown list |
|
Client Company Name - Alpha
(belonging to this group) |
SON (Reverse Chrono) |
Position (Vacancy Name) |
Consultant Name |
Interview Panel |
Prelim. Interview Schedule
Date. |
|
12356 |
|||||
|
42986 |
Note
- Clicking on any particular SON should
open-up another window/screen, where, one can view Report No: 44
for that sales order. Closing the new window would return to original
screen.
SERIAL NO: 15 / Change
Request No: 2 / Item No: 5
PARENT-GROUP WISE BIO-DATA
SENT REPORT.
|
From (Date) |
To (Date) |
|
Parent Group Name |
clickable Drop-down list |
|
Client Co. Name - Alpha
(belonging to this Group) |
SON (Reverse chrono) |
Position (Vacancy Name) |
PEN |
Affiliate ID No. |
Candidate Name |
Date on which resume sent |
|
12345 clickable |
Note
Clicking on any particular SON,
would open-up another window/screen, where, one can view Report NO: 36,
for that Sales Order. Closing the new window would return to the original
screen.
SERIAL NO: 15 / Change
Request NO: 2 / Item NO: 6
27-12-2001
PARENT-GROUP WISE INTERVIEW
HELD REPORT
|
From (Date) |
To (Date) |
|
Parent Group Name |
Clickable Dropdown List |
|
Client Name (Alpha) |
SON |
Position (Vacancy Name) |
PEN |
Affi. ID NO. |
Candidate Name |
Date of Interview |
Interview Round No. |
Result. |
SERIAL NO: 15 / Change
Request NO: 2 / Item No: 8
27-12-01
"ALLY (AFFILIATE) WISE
BIO-DATA SENT" REPORT
|
From (Date) |
To (Date) |
|
Type of Affiliate |
Clickable Dropdown |
|
Name of Affiliate |
Clickable Dropdown |
|
Whose Resume Was Sent? |
To Whom was it sent? |
When was it sent? |
For Which Position was it
sent? |
Against which Sales order
was it sent? |
If this candidate got
appointed |
|
PEN |
Candidate Name |
Client Co. Name |
Date Sent |
Position (Vacancy Name) |
SON |
Note
To enable preparation of this REPORT,
Shopping Basket is being modified so that, corresponding to each PEN
(appearing on every Shopping Basket), there will be
- Affiliate ID NO
- Affiliate ID Type
- Affiliate ID Name
} from which, resume, bearing
that PEN has arrived,
SERIAL NO: 17 / Change
Request NO: 2 / Item No: 11
27-12-01
CURRENT STATUS = CLIENT-WISE,
DATE WISE REPORT
|
From (Date) |
To (Date) |
|
Branch |
Consultant |
|
Client Name |
Dropdown List |
|
Contact Person |
Phone No |
|
Designation |
E-mail |
|
SON (Rev. Chrono) |
Final Invoice No |
Invoice Date |
Invoice Amt. Rs. |
Amount Recd. so far |
Amount Remaining to be
Received |
TDS Status |
Closure Status |
Reason for Closure |
Remarks. |
|
3245 |
|||||||||
|
42/8-8-2001 |
45000 |
30000 |
15,000 |
||||||
|
63/12-9-2001 |
11000 |
11000 |
- |
||||||
|
98/15-12-2001 |
18000 |
- |
18000 |
||||||
|
6389 |
NOTES
- All types of Invoices must be shown (es: Min.
Search / Adv/ Progr. Payment/ ODP Exp/ Final Invoice etc).
- There could be more than one cheque payments
against any given invoice. All must be added up to compute "Amount
Remaining To be Received".
APPLITECH SOLUTION
August 21, 2000
To
3P Consultants Pvt Ltd,
R-1, Lok Bharati Complex,
Marol Maroshi Road, Andheri (E)
Mumbai: 400 059
Kind Attention: Mr. Hemen C
Parikh - Director
Dear Sir,
Sub: Proposal for Internal
Management System
This refers to the discussions we
had in the recent past on the above-referred subject.
Further to the discussions and
the Pre - System Requirement Study conducted by our Mr. Tapan Shah from
Ahmedabad, we have prepared our offer for the customized software solution for
your Internal Management System as per your requirement. Please find the
proposal enclosed for your kind perusal.
We have taken care that the
system proposed would cater your future requirements of integration with the
web-enabled applications.
As we are in the process of
getting the coveted CMM level 3 certification, all the processes to be followed
in the making of the software solution for you would be as per the CMM
methodologies and the ISO 9001 procedures. You can be rest assured
about the delivery and the quality of the software solution.
We have also included the company
profile, the partial client list and the profiles of our directors for your
reference.
We hope you find our offer in
line with your requirement and place your valuable Purchase Order with us at
the earliest.
Please do contact us should you
require further information or clarification.
Thanking you and assuring you our
best services at all times
For Applitech Solution Ltd
K. Sudhakar (signature)
Manager - Sales
Encl: As above
ISO 9001 Company
August 2000
-1-
Applitech Solution Limited
102 Rock Garden, 1st Floor, Opp.
Laxmi Industrial Estate, New Andheri Link Road, Andheri (West) Mumbai - 400058
Tel: 91 (22) 631 0142, 632 7119
email: aslbmy@bom3.vsnl.net.in
An ISO 9001 Company
Applitech Solution Ltd
3P Consultants Pvt Ltd
Applitech Solution Limited
Proposal
For
Internal Order Processing
Management System
TO
3P Consultants Pvt. Ltd.
Applitech Solution Limited
Enterprise Wide Computing Group
701, Shikhar, Netaji Marg,
Navrangpura
Ahmedabad - 380013
Call: 91 (79) 6568249, 6568709, 6568797
Fax: 91 (79) 6569489
Mumbai Office:
102, Rock Garden,
New Link Road, Andheri (W),
Mumbai - 400053
Phone: 91 (22) 6327119 / 6310142
E-mail: aslahd@vsnl.com / aslbmy@bom3.vsnl.net.in
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
INDEX
|
Executive Summary |
3 |
|
Scope of work |
4-5 |
|
System Tool |
6 |
|
Commercial offer |
7-11 |
|
Company profile of Applitech
Solution Ltd |
12 |
|
Details of Director |
13 |
|
Company Background |
14-15 |
|
Projects Executed |
16 |
|
Web project expertise |
17 |
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Executive Summary:
3P Consultants Pvt Ltd, is a
leading Human Resource solution providing organisation having leading
industries and companies as their clients. The exploitation of the latest
technologies in communication and IT by 3P consultants has provided them a
cutting edge in their field of operation. The innovative schemes offered by
them to the various sources to collection the resource (the information of the
candidates) have accelerated the reach to the grass root levels and are poised
for a leaping growth with the explosion of IT and convergence technology growth
in the coming years.
3P Consultants Pvt Ltd, having
visualised the growth potential, would like to have an Internal Order
Processing Management System, which would allow them to address the present and
future demands.
We, Applitech Solution Ltd, a
leading IT solution provider specialising in providing customised applications,
discussed with 3P consultants about their requirement of the Internal Order
Processing Management System. Having conducted a Pre - System Requirement Study
at 3P Consultants, we propose the following solution for the Internal Order
Processing Management System.
A broad overview of the Internal
Order Processing Management System is given below:
It would be a Client - Server
based solution with web enabled components for the future expansions
and integration using the web technology.
The system would be implemented
in the Mumbai office of 3P Consultants Pvt Ltd
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Scope of Work:
The entire operation is divided
in 3 Phases.
Phase I : Creation of
modules which would take care of the normal work flow.
Phase II : Auto e- Mailing
to candidates shortlisted from the search about the interview, extensive MIS
reports, Balance of Payment for each P.O, Client etc
Audit trails on the above
Phase III : data migration
from the currently existing database to the new database structure
Auto email- enabling the alerts
to the potential candidates about the new requirements, and alerts to the
clients on the availability of new CVs as per their requirements.
In Phase I and Phase II, the
database masters of the candidates and the clients have to be newly constructed
.The modules will not access the existing database directly.
The details of scope of work in
each phase is given below
Phase I:
This involves the System
Requirement Study, design coding and implementation of the essential modules of
the Internal Order Processing Management System.
The modules would allow
transactions between Client, 3P Consultants and the Candidate.
The logical sequence of the
workflow would be as below.
Phase I
- Creation of database structure for client,
candidate
- Registration of Purchase Order for each enquiry
from a client
- Scanning the database for the requirement
- Sending the suitable resume for the evaluation
- Scheduling the interview
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
- Getting the details of offer given to the selected
candidates
- Raising invoice for the service charges
- Documentation of follow up for the Balance of
Payment
- MIS reports of the cases handled, Advance given,
B.O.P/ receivables etc, client wise, P.O wise, Consultant wise & date
wise
All the correspondence with the
client and the candidate would be registered and is subject to audit trail.
Phase II
- Auto E Mail to candidate once the client selects
the CV for a particular assignment
- B.O.P reminder for each client, Purchase Order.
- Documentation on correspondence on the follow up
- Extensive MIS reports
Note: All the data of
candidate and the client have to be entered in the new system masters for the
access. The system would not provide direct access to the current database
Phase III
- Data Migration for the existing CV, client database
- Auto e mail to the candidate once a client
registers a new requirement suitable to the candidate's resume
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
- Auto e mail to the client once a candidate
registers a new cv suitable to the client's requirement
The System Tool
The Back end for the
system would be Oracle 8I for allowing the easier web enabled upgrades
in future.
The front end would be
decided only during the System Requirement Study as this would involve
the following factors apart from suitability to the system to be developed.
- Ease of use
- Tool's availability, life cycle
- Cost of the tool
The front end would be chosen
keeping in mind that the the future requirements of web based software
components have to be interfaced seamlessly.
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Commercial offer
Ref: ASL/3P/ERP/03
August 20, 2000
QUOTATION
|
Description |
Prices (Rs.) |
|
Internal Order Processing
Management System - customized Application software including: System
Requirement Study, Design, Coding, Implementation and Training |
5,70,000.00/- (Rupees
five lakh seventy thousands only) |
|
Professional service charges(
DBA visit for OS installation, fine tuning of Database, Network related
consultations, etc) |
Rs2500.00/- Per manday |
|
Transport charges - II AC Rly
ticket from Ahmedabad to the site |
At actuals |
|
Boarding and lodging charges
for implementation duration more than 2 months - as given in the schedule. |
Rs.2500.00/- Per Manday |
- The application would be developed in 3 Tier
architecture to cater the future needs of web enabled application
integration.
Roles and Responsibilities:
Once the work is awarded,
Applitech will take the overall responsibility of the Project Execution and
Project Management. However for the successful implementation, quality time and
timely approvals of various documents at different stages by 1Adani
Port will be essential.
|
Sr. No. |
Activity |
Responsibility |
|
Preparation of System Design
document and Screen prototypes |
Applitech |
|
|
Timely approval of System
Design document and Screen prototypes |
3P Consultants |
|
|
Coding, Testing and
Documentation |
Applitech |
|
|
User Acceptance Testing and
approval of the documentation |
3P Consultants |
|
|
Implementation |
Applitech |
|
|
Scheduling of the users for the
Training |
Applitech |
|
|
Training |
3P Consultants |
|
|
Supply and Set up of Hardware |
3P Consultants |
|
|
Supply and set up of Networking
Components |
3P Consultants |
Note: Enough time will
have to be given by 3P Consultants Personnel to study and approve the System
Design Document and Screen prototypes.
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
It is presumed that the site
would be ready in all respects (including the required hardware and networking
components) at the time of implementation. However, Applitech would recommend
the exact hardware specifications, only after the Design phase is over.
During Implementation and
Training the users of the system at 3P Consultants will have to give full
co-operation in terms of availability and time given.
Project Execution Plan
Applitech proposes to implement
application software development phases. The Project development plan for
application development is broadly divided into 3 phases.
Stage I
During this stage, following
activities will be performed:
System Requirement Study
Entry Criterion
Receipt of confirmed Purchase
Order along with advance at Applitech Solution Ltd, as per the commercial offer
and terms and conditions mutually agreed.
Exit Criterion
Completion of the System
Requirement Study
Deliverables
Detailed System Requirement Study
document. Sufficient time would be given to 3P consultants to study the System
Requirement Study documents. The System Requirement Study documents would be
mutually agreed in writing to pave the way for the stage II.
The approximate time schedule
for this stage would be 10 DAYS.
Stage II
During this stage, following
activities will be performed:
Design and system specification
Physical design
Entry Criterion
Approval of System Requirement
Study document
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Exit Criterion
Completion of the System Design
Deliverables
Detailed System Design document
which shall include final data model, updated process description, screen
design document and menu design document
Time Length for this stage is
30 Days from completion of stage I.
Stage III
During this stage, following task
shall be performed:
Coding, testing and documentation
for application software
User Acceptance Testing at
development site
Entry Criterion
Approval of the System Design and
Screen Prototypes
Exit Criterion
Successful User Acceptance
Testing and provisional sign-off by 3P Consultants
Deliverables
Implementation Schedule
Time Length for this stage is
40 days from completion of stage II
Stage IV
During this stage, following task
shall be performed:
Installation of the software at
3P Consultants
Training of the users
Entry Criterion
Provisional sign-off of the
software
Exit Criterion
Implementation and completion of
training of the different users
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Deliverable
Executable software
All documentation (i.e. System
documentation, user and operational manuals)
Time Length for this stage
depends on 3P Consultants users and the readiness of various departments. The
time length proposed is 20 Days
Services
During implementation, Applitech
will provide the following services:
Software Installation &
Test Run
ASL will install the software on
the hardware and carry out the test run jointly with 3P Consultants. This
exercise will be carried out with sample test data prepared by 3P Consultants
Pvt. Ltd., and all outputs taken and verified by the joint team.
Training
ASL will conduct training at
different levels to prepare 3P Consultants personnel's for the computerized
operations. The typical training plan is as follows:
TRAINING PROGRAM
|
Duration |
No. of Participants |
|
|
Orientation Program for Top
Management |
1 day |
2 to 3 |
|
Functional Operation for
Operators/staff |
1 week |
7/week |
|
System Administration Training |
2 day |
1 |
Warranty Maintenance
ASL will provide warranty
maintenance for the software for a period of 90 days from the date of
software installation at Mumbai site.
After the warranty maintenance
period, ASL can provide software maintenance services under an annual contract.
Annual Maintenance Contract
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
After the expiry of the warranty
period at the first site, 3P Consultants Pvt. Ltd, can choose to undertake an Annual
Maintenance Contract (AMC) with ASL for the individual sites which will be
charged at 16% of the total price per site per annum. The annual
maintenance contract would be restricted to the correction of any bug or
software defect in the application software. The AMC would not include
site-visits for any purpose other than bug fixing.
- Payment terms
- 20% with the Purchase Order
- 20% on Submission of System Design Documents
(including ER diagram, Screen prototypes and Data Dictionary)
- 20% on the Provisional acceptance of the
software at the Development Lab or installation of software at site (which
ever is earlier)
- 20% on integration
- 20% within 2 weeks of running complete
software at site.
- Terms and Conditions
Prices
The prices quoted include the
supply of run-time version of the software, license copy for 3P Consultants
Mumbai.
The prices do not include the
cost for System Software like Oracle 8i, Windows NT, multimedia tools etc. All
other Govt. levies including Sales tax, Octroi etc, if applicable are extra.
Master data creation, site preparation, cabling and power conditioning is not
included.
License fee
The software License is for the
3P Consultants Mumbai. Installation of the software at additional site will be
charged extra at mutually agreed price.
Functionality
The scope and functionality of
the application software will be as mentioned in System Requirement Study
Report. Any change in the scope and functionality of the application software
will charged extra at Rs.60,000/- per man-month basis.
Travel and Stay
For all visits from Ahmedabad to
Mumbai, during the Design / coding / implementation / training stage the travel
will be charged at a rate equivalent to the second AC railway fares from
Ahmedabad to the site. All travel and stay required for on-site maintenance and
support services, would be extra, if out side warranty period.
Validity of offer
The license fees quoted above are
firm for a period of 30 days from date of this offer. These prices may
be revised thereafter.
Non-applicable Costs
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Electrical work, UPS, Air
conditioning, furniture, cables, line drivers, master data creation, etc. are
not included in the cost and would be provided by 3P Consultants Pvt. Ltd.
Development Work
All the development work will be
carried out at Applitech Solution Ltd, Ahmedabad/ Mumbai
Company Profile
|
Name of the company |
Applitech Solution Limited |
|
Year of Establishment |
1993 |
|
Reg. Office address |
503, 'Paritosh', Usmanpura,
Ahmedabad 380 013, Gujarat, India. |
|
Locations of office with
address |
Ahmedabad |
|
503 'Paritosh', Usmanpura,
Ahmedabad - 380 013, India |
|
|
Tel: (079) 7550683 / 7550685 |
|
|
701, 'Shikhar', Netaji Marg
Navrangpura, |
|
|
Ahmedabad - 380 009, India |
|
|
Tel: (079) 6560248 / 6568797 |
|
|
Vadodara |
|
|
55, Kamlesh Park, Near
Karelibaug Water Tank, Harni Road, |
|
|
Vadodara - 390006. |
|
|
Tel: (0265) 442843 |
|
|
Mumbai |
|
|
102, Rock Garden, New Link
Road, |
|
|
Andheri (West), Mumbai - 400
053. |
|
|
Phone (022) 6310142/6327119 |
|
|
USA |
|
|
1501 Ben Crenshaw, Austin,
Texas 78746 |
|
|
Phone 1(512) 3271323 |
|
|
Singapore |
|
|
12, Prince Edward Road, #04-09 |
|
|
Podium B Bestway Building, |
|
|
Singapore - 079212. |
|
|
Phone (65) 2271184 |
|
|
UK |
|
|
74 A High Street, Wansted,
London EU 2RJ |
|
|
Phone: 0181 989 1110 |
|
|
Australia |
|
|
Suite 9, 30-32 Rutland Road, |
|
|
Box Hill, Victoria 3128
Australia |
|
|
Phone (61-3) 9897 4885 |
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Details of Directors
Mr. Ankil C Patel, Managing
Director
Academic Qualifications:
B.E. in Electrical Engineering
from M.S. University, Baroda
M.S. in Electrical Engineering
from University of Texas, Austin
Experience:
Worked in Intel Corporation,
Santa Clara, California, USA, a world-renowned company in the field of
computers, for seven years as Sr. Design Engineer. At Intel his duties included
product definition, implementation plan, logic and circuit design and simulation,
layout supervision, design verification and supporting product engineers for
bringing up test programs and transfer of product into production. He worked on
several products including microprocessors and peripherals. He has played a
major role in the team, which has developed the 80386 chips at Intel.
In India, he has received 'IEEE
Award' for best software product Dial Anything, a communication
software package for Personal Computers.
Mr. Jayesh A. Parekh, Director
Academic Qualifications:
B.E. in Electrical Engineering
from M.S. University, Baroda
M.S. in Electrical Engineering
from University of Texas, Austin
Experience:
Worked in IBM, a world renowned
company in the field of computers, for fifteen years in its offices world wide,
namely, IBM Houston Marketing office, IBM Offshore Operations Singapore, IBM
Corporation USA & IBM Singapore Pte. Ltd.
He is currently Managing Director
of Frontier Technologies Pte. Ltd. Singapore.
Other Engagements
Director - Frontier Information
Technologies Inc. (USA)
Director - Dixylar International,
Inc. (USA, Singapore & India)
Director - Applitech Solution
Limited, India
Director - SONY Entertainment
Television (Singapore & India)
Director - Argos Communications
Enterprise Pte Ltd. (Singapore)
Director - Acid Telecom Pvt. Ltd.
(India)
Director - Atlas Equifin Pvt.
Ltd. (India)
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Company Background
INTRODUCTION
Applitech is a leading software
developer in India, providing software solutions, consultancy and software
development services. It is positioned to deliver rapid, reliable and robust
Information Technology solutions that work.
Applitech's mission:
Excellence through
partnership, solutions and technology. Unrelenting in our drive to offer the
best solutions, linking our core competencies with our customer's business
requirements in ways that ensure that we are the customers preferred techn1ology
partner.
Applitech has a technical and
project management staff strength of over two hundred IT professionals.
Collectively this adds up to more than 500 person years of software development
experience. Applitech has an established local presence in USA, Singapore and
the UK, and works through business alliances in Australia.
SERVICES
Applitech has successfully
executed many projects in each of the following four business focus areas:
- ERP solutions for manufacturing, healthcare and
service industries
- Web computing based solutions and customized
applications
- Process Control and Automation based solutions for
the Manufacturing Industry.
- Software solutions in Network and Communications
Applitech provides a portfolio of
solutions, services and products, both it's own and its alliance partners, that
offer superior value by integrating the best combination of price, quality,
reliability and delivery.
Applitech also provides a range
of professional services to both its clients and alliance partners (in domestic
and international markets) including IT consultancy and business process
re-engineering.
Applitech's group company Dixylar
has set-up a dedicated conversion center (DDC) or software factory in India, to
undertake projects for Year 2000 code correction and testing. Necessary Data
Conversion services is also offered. Equipped with Dixylar suite of Year 2000
tools and workbench Applitech has currently invested in setting up a 50-person
year production capacity.
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Applitech has positioned
itself to provide a single Point Total Business Solution. It has the
required development and quality assurance processes to ensure timely delivery
of hardware, networking and high quality, low maintenance software.
Applitech offers to establish Dedicated
Development Centers (DDC) in India, for its clients and alliance partners,
from India and abroad, in their respective niche areas. This is a long-term
partnership where a team of professionals and other development resources are
dedicated to work on behalf of the client/partner. The team are trained to
match clients specific requirements and standards. Team management and software
development process allows for extensive input and monitoring by client (via a
dedicated datacom link where required). This facility works as an extension of
clients' facility and has the key advantage of high quality service at lower
costs.
Skills and Capabilities
Applitech technical personnel is
highly qualified (a majority with technical or science degrees and over 20\%
with some form of postgraduate qualification), trained in a range of computer
hardware and software areas. All members of top management have lived, studied
and worked abroad - ideal basis for overcoming the culture gap, as well as
comprehending clients' tangible and qualitative needs and requirements.
Applitech's managers and project
leaders possess the experience and management skills necessary for successful
execution of large software projects. In-house processes, infrastructure and
communications skills ensure trouble free interaction and smooth liaison with
clients at any distance.
Overall, Applitech can deliver a
competitive edge through cost and quality advantage, use of the state-of-art
skills, high reliability and ability to save time on projects.
Applitech's Advantage
- Experience in Oracle based applications since 1994
- State-of-the-art development facilities
- Global support infrastructure
- Proven capabilities to build and maintain large
complex systems
- Culture for building application knowledge, value
added professional services
- Adherence to standards and methodologies
- Quality - an on going process of change
Our philosophy is building
relationships that last with all our stakeholders - clients, employees and
shareholders. We will do so by being sensitive and responsive, and by being
true to our commitments.
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Projects Executed
Expertise in Specific Industry
Applitech has catered to
customers from different business segments and offered solutions to their
satisfaction. The following is the partial list of type of Industries for which
we had done project development.
|
No. |
Industry |
Some of our clients |
|
1. |
Manufacturing (FMCG) |
Nirma Ltd. |
|
2. |
Manufacturing (Production) |
Shree Rama Multi-tech Ltd. |
|
3. |
Manufacturing (Electronics) |
Western Digital - Singapore. |
|
4. |
Manufacturing (Engineering) |
Burnmann India Ltd. |
|
Vijay Tanks & Vessels Ltd. |
||
|
5. |
Import and Trading |
Adani Wilmar Limited |
|
6. |
Petrochemical |
IPCL |
|
7. |
Mineral / Mining |
GMD.C. |
|
8. |
Dairy (Milk Distribution) |
Gujarat Co-operative Milk
Marketing Federation (GCMMF), Anand. |
|
Dudhasagar Dairy, Mehsana. |
||
|
9. |
Garment Export |
Vogue. |
|
Parex Overseas. |
||
|
10. |
Drugs and Pharmaceuticals |
Hoechst Marion Roussel (HMR). |
|
11. |
Entertainment Industry |
SONY Entertainment Television. |
|
12. |
Fixed Deposit System |
Interface Capital Market Ltd. |
|
CanJay Finance Ltd. |
||
|
13. |
Health / Pathology Laboratory |
VIP Diagnostics. |
|
Specialty Ranbaxy Ltd. |
||
|
14. |
Port |
Maritime and Port Authority of
Singapore. |
|
Kandla Port Trust |
||
|
15. |
Telecommunications |
Aura Systems, Canada (for
Telecommunications Dept. of Argentina and Morocco Government). |
|
16. |
MOA Shell for Oceanography and
Meteorology Applications |
Space Application Centre (ISRO) |
|
17. |
Website Creation &
Directory |
Southern Gujarat Chamber of
Commerce and Industry (SGCCI) |
ISO 9001
August 2000
Applitech Solution Ltd
3P Consultants Pvt Ltd
Experience in development of
web sites
MAJOR VIRTUAL WEBSITES
INTERACTIVE
- www.suratchamber.com
- www.aslhome.net
- www.frointerinftech.com
- www.groopoor.com
- www.applitechsolution.com
NON INTERACTIVE
- www.whitelens.com
- www.dbjariwala.com
- www.srmtl.com
- www.isq9001.com
- www.hindupensaving.com
- www.acrossworld.com
- www.psmpressures.com
- www.fujisilk.com
- www.rangoonflying-tiger.com
- www.ssjinee.com
- www.bmsilkmills.com
- www.ambujagroup.com
MAJOR NON VIRTUAL WEBSITES
- D.Khushalibhai Jewelers, Surat
- Shree Matushree Silk Mills, Surat
- Amar Textiles, Surat
- V.N. Mehta & Company, Surat
- Rohit Traders, Surat
- Happy Engineering, Surat
- Gombhai Kalias Janwala, Surat
- Vishnu Corporation, Surat
- Marble House, Surat
- A-One Industries, Surat
- Rangoon Chemicals Works Pvt. Ltd, Surat
- Saikat Texo-Food Industries, Surat
- Jayantilal Chhaganlal, Surat
- C & C International
- Dhamma Lucas Pvt. Ltd.
- Vipul Enterprises
- Silver Enterprise
- Laxmi Yarns Pvt. Ltd.
- Jalpari Manufacturing Co.
- Pooja Groups - Builders & Developers
ISO 9001 Company
August 2000
A P P L I T E C H
SOLUTION
February 21 2001
To
3P Consultants Pvt Ltd
R-1, Lok Bharti Complex,
Marol Maroshi Road,
Andheri (E)
Mumbai: 400 059
Kind Attention: Mr. Hemen C
Parikh
Dear Sir,
Sub: Estimation for the
reports generation and additional scope of work
This refers to the discussions
our SRS team had with you, Mr. Nirmit and Mr. Nagle for the finalization of the
scope of work. The proposed Scheduler and the Change Requests have been
discussed and the same has been enclosed for your kind reference.
The list of reports which are to
be generated through the Order Processing Module has also been enclosed for
your reference. We had suggested earlier in our offer that the reports would be
generated through Crystal Reports and later it is agreed that the reports would
have to be generated through the module itself. The no. of reports are 92 (
including additional 10 reports listed in the Change Request from enclosed).
Since 3P Consultants are a very
important customer to us, we have reduced the man-day charges for the
additional scope of work. The Commercial details are enclosed for your
reference, kindly let us know your acceptance at your earliest.
We assure you that the work in
the project is progressing very well and we are confident to provide you the
Order Processing Module in the stipulated time.
Please let us know, should you
require further information or clarification.
Thanking you and assuring you our
best services at all times
For Applitech Solution Ltd,
K. Sudhakar
Manager - Sales
Encl: As Above
Applitech Solution Limited
102 Rock Garden, 1st Floor, Opp.
Laxmi Industrial Estate New Andheri Link Road, Andheri (West) Mumbai - 400058
Tel: 91 (22) 631 0142, 632 7119
email: aslbmy@bom3.vsnl.net.in
- Monthly Shopping Basket Summary (for a given
Period)
|
From Month (MM/YY) |
to Month (MM/YY) |
|||||
|
Month Year |
No of Inquiry received (1) |
No of shortlisted PEN |
Avg. No of Pen Per Inquiry |
Number of inquiry converted
into order (2) |
Percentage conversion
(2)/(1)*100 |
Average time (in days) to
reply* |
*Proposal date - inquiry date
- Shopping Basket Summary (URL wise)
URL (Partner Website)
|
Date Arrives |
Inquiry no. |
Date proposal sent |
Time Taken |
Industry |
Function |
Vacancy name |
Number of PEN |
SON |
Consultant name |
- Shopping Basket Statement (for a given Period)
|
Date |
Inquiry no |
URL from which came |
When replied |
Days taken to reply |
Client Name |
Vacancy name |
Industry |
Designation |
Consultant name |
|
|
|
|
|
|
|
|
|
|
|
- Shopping Basket Designation level wise(vacancy
wise) (for a given Period)
DESIGNATION. LEVEL
|
Inquiry no. |
URL from which came |
Date arrived |
Date replied |
Days taken to reply |
Consultant |
SON |
Industry |
Function |
No of shortlisted PEN |
- Shopping Basket (Function wise) for a given Period
FUNCTION
|
Inquiry no. |
URL from which came |
Date arrived |
Date replied |
Days taken to reply |
Consultant |
Whether converted in to
order |
Industry |
Designation Level |
No of shortlisted PEN |
- Shopping Basket (Industry wise) for a given Period
INDUSTRY
|
Inquiry no. |
URL from which came |
Date arrived |
Date replied |
Days taken to reply |
Consultant |
Whether converted in to
order |
Designation Level |
Function |
No of shortlisted PEN |
- Shopping Basket (Client wise) (for a given Period)
Client
Address
Ph
Fax
Email
Name of contact person
|
Inquiry no. |
URL from which came |
Date arrived |
Date replied |
Days taken to reply |
Consultant |
Whether converted in to
order |
Industry |
Function |
No of shortlisted PEN |
- Shopping Basket Consultant wise (for a given
Period)
CONSULTANT
|
Inquiry no. |
URL from which came |
Date arrived |
Date replied |
Days taken to reply |
Client |
Whether converted in to
order |
Industry |
Function |
No of shortlisted PEN |
- List of inquiry for a given period
|
From Date: |
To Date: |
|
Date (chronologically) |
Inquiry no |
Client name |
Vacancy name |
No of vacancies |
Function |
City of posting |
- List of inquiry for a given period (consultant
wise)
|
From Date: |
To Date: |
|
Consultant name |
|
|
Branch |
|
Date (Chronologically) |
Inquiry no |
Client name |
Vacancy name |
No of vacancies |
Function |
Industry |
City of posting |
- List of inquiry for a given period (Industry wise)
|
From Date: |
To Date: |
|
Industry name |
|
Date (Chronologically) |
Inquiry no |
Client name |
Vacancy name |
No of vacancies |
Function |
Consultant name |
- List of inquiry for a given period (Function wise)
|
From Date: |
To Date: |
|
Function name |
|
Date (Chronologically) |
Inquiry no |
Client name |
Vacancy name |
No of vacancies |
Consultant name |
Industry |
- List of inquiry for a given period (vacancy wise)
|
From Date: |
To Date: |
|
Vacancy name |
|
Date (Chronologically) |
Inquiry no |
Client name |
Consultant name |
No of vacancies |
Function |
Industry |
- List of inquiry for a given period (City wise)
|
From Date: |
To Date: |
|
City of posting |
|
Date (Chronologically) |
Inquiry no |
Client name |
Vacancy name |
No of vacancies |
Function |
Industry |
Consultant name |
Country |
- List of inquiry for a given period (Country wise)
|
From Date: |
To Date: |
|
Country of posting: |
|
Date (Chronologically) |
Inquiry no |
Client name |
Vacancy name |
No of vacancies |
Function |
Industry |
Consultant name |
City of posting |
- Number of Inquiries remaining to be answered
(consultant wise)
Consultant name
Branch
|
Inquiry number |
Inquiry date |
No of days pending |
- List of inquiries which did not convert in to an
order (Consultant wise)
|
From month/year: |
To month/year: |
||||||
|
Inquiry No. |
Client name |
Vacancy name |
Inquiry Date |
Proposal date |
Proposal no |
Reason (Sorted on) |
|
- Inquiry Status (Consultant wise)
|
From Date: |
To Date: |
|||||
|
Inquiry No. |
Client name |
Vacancy name |
Inquiry Date |
Proposal sent(Y/N) |
Proposal no |
Proposal Date |
- Proposal
As per Format (Ref. SRSPR01)
- Sales Order
Standard letter format to be
given by 3P
- Project Plan for a sales order
Sales order no
Consultant Name
Branch
Client
Email
Original
Vacancy name
No of Vacancy
Project plan no
Contact person name
Telephone:
Designation:
|
Activity |
Estimated Date |
Actual Date |
Revision
|
Activity |
Estimated Date |
Actual Date |
- Project Variance for sales Order
Sales order no
Consultant Name
Branch
Client
Email
Original
Vacancy name
No of Vacancy
Contact person name
Telephone:
Designation:
|
Project start Date
(estimated) |
Project start Date (Actual) |
|
Project end Date (estimated) |
Project end Date (Actual) |
|
Duration (estimated) (in days) |
Duration (actual) (in days) |
Difference (actual duration -
estimated duration) (in days)
|
Activity |
Estimated End Date |
Actual End Date |
Difference in days |
- Pending order for a consultant chronologically
Consultant name
|
Date of Proposal |
Client name |
SON |
Proposed end date
(chronologically) |
Vacancy name |
No of vacancy |
Estimated* Billing Value |
- (No of vacancies)(salary to be
offered)(professional fees)
- Pending order for a consultant (client wise)
Consultant name
Branch
|
Client name (sorted on) |
Date of Proposal |
SON |
Vacancy Name |
Estimated Billing Value |
Proposed end date |
- Pending order for a consultant (Vacancy Name wise)
Consultant name
Branch
|
Vacancy Name (sorted on) |
Client name |
SON |
Date of Proposal |
Proposed end date |
- Pending order for a consultant (Estimated Billing
Value wise)
Consultant name
Branch
|
Estimated Billing Value
(Descending) |
Client name |
Vacancy Name |
SON |
Date of Proposal |
Proposed end date |
- Pending order for a client chronologically
Client name
|
Date of Proposal
(chronologically) |
Consultant |
Branch |
SON |
Proposed end date |
Vacancy Name |
Estimated Billing Value |
- Pending order for a client (consultant wise)
Client name
|
Consultant name (sorted on) |
Branch |
Date of Proposal |
SON |
Vacancy Name |
Estimated Billing Value |
Proposed end date |
- Pending order for a client (Vacancy Name wise)
Client name
|
Vacancy Name (sorted on) |
Consultant name |
Branch |
SON |
Date of Proposal |
Proposed end date |
- Pending order for a client (Estimated Billing Value
wise)
Client name
|
Estimated Billing Value
(descending) |
Consultant name |
Branch |
Vacancy Name (sorted on) |
SON |
Date of Proposal |
Proposed end date |
- Pending status for a given period (industry wise)
Pending status for the period
from <SON start date> to <SON end date>
|
Industry |
Estimated Billing Value |
Function |
Consultant name |
Vacancy Name |
SON |
End Date of project |
- Pending status for a given period (function wise)
Pending status for the period
from <SON start date> to <SON end date>
|
Function |
Estimated Billing Value |
Industry |
Consultant name |
Vacancy Name |
SON |
End Date of project |
- Pending status for a given period (designation
level wise)
Pending status for the period
|
Designation level |
Estimated Billing Value |
Industry |
Consultant name |
Function |
SON |
SON End date |
End Date of project |
- Load on consultant
|
From Date: |
to Date: |
|
Consultant name |
Branch: |
|
Sr. no |
Sales order no |
Client |
Vacancy Name |
No of vacancies |
Expected end date (Reverse
Chronological) |
- Resumes remaining to be sent (order wise)
|
Sales Order Number |
Client name |
Vacancy name |
No of Vacancies |
Consultant name |
|
PEN |
Candidate name |
Branch |
||
- Resumes sent out for an order
|
Sales Order Number |
Client name |
Consultant name |
Date Sent |
|
PEN |
Candidate name |
Branch |
|
- One line statement (for consultant)
As per Format (Ref. SRSOL01)
- One line statement (for client)
As per Format (Ref. SRSOL01)
(This statement will not have the
contact numbers and the agency contact as per the format)
- Details of prospective candidate
As per Format (Ref. SRSPC01)
- Advertising Details for a client (for a given
Period)
|
Client |
Contact person name |
|
E-mail |
Phone: |
|
Payment made by 3P (Y/N) |
|
|
Reimbursed by client (Y/N) |
|
Advt. No. |
Media |
Location |
Date Published |
Cost |
Response |
- Advertising response (client wise) (for a given
Period)
|
Client |
Contact person name |
|
E-mail |
Phone: |
|
Advt. No. |
Media |
Date Published |
Response |
|
Client |
Contact person name |
|
E-mail |
Phone: |
|
Advt. No. |
Media |
Date Published |
Response |
- Advertising response (media wise) (for a given
Period)
|
Media |
|
|
Advt. No. |
Client |
|
Media |
|
|
Advt. No. |
Client |
- Interview call sent out for an order
|
Sales Order Number |
Client name |
Vacancy name |
No of Vacancies |
Consultant name |
Date of sending interview
call letter |
Date of Interview |
|
PEN |
Candidate name |
Branch |
||||
- Interview Schedule for Sales Order
Sales order no
Consultant Name
Branch
Client
E-mail
Interview no.
Vacancy name
No of Vacancy
Contact person name
Address
|
PEN |
Name |
Venue |
Tel |
Date |
Time |
Mode of communication |
Confirmation (Y/N) |
Other info |
- Interview held Summary Client wise
- Interview held Summary Client wise (Continued)
SON
Client Name
Vacancy name
No. of vacancies
Function
|
PEN |
Candidate name |
Date |
Interview round no. |
Result* |
*SHORT LISTED, HOLD, SELECTED AND
REJECTED
- Interview held Summary
|
From Date: |
To Date: |
|||||
|
Date (Revers e Chronology) |
PEN |
Candidate name |
Client name |
Vacancy Name |
Interview round no. |
Result* |
*SHORT LISTED, HOLD, SELECTED AND
REJECTED
- Follow up details for an order of given client
Client
E-mail
Sales Order Number
Contact person name
Address
Vacancy name
No of Vacancies
Consultant name
Branch
Mode of communication
|
Date of follow up
(Chronologically) |
Activity of follow up |
Outcome of follow up |
Next follow up date if any |
- Follow up with candidate (for a given Period)
|
PEN |
Name |
|
E-mail |
Address |
- Follow up with candidate (for a given Period)
(Continued)
|
Sales order no |
Vacancy name |
|
Consultant Name |
No of Vacancy |
|
Branch |
Client name |
|
Activity |
Date |
Out Come |
Next follow up date |
Mode of communication |
- Client wise Expected date of joining
Client name
Sales order no
Consultant Name
Branch
Vacancy name
No of Vacancy
|
PEN |
Name |
Expected date of joining |
- Details of Compensation received for an order
|
Sales Order Number |
Client name |
Vacancy name |
No of Vacancies |
Consultant name |
Branch |
Gross Annual Compensation |
|
PEN |
Candidate name |
Date of joining |
||||
- Compensation details remaining to be received for
an order
|
Sales Order Number |
Client name |
Vacancy name |
No of Vacancies |
Consultant name |
|
PEN |
Candidate name |
Branch |
||
|
Date of joining |
||||
- Compensation Details
As per Format (Ref. SRSCF01)
53. Invoice
As per Format (Ref. SRSIN01)
54. Invoice (for Final
Payment) summary (client wise) for given period month wise
|
Client name |
Contact person |
|
From month: |
To month: |
|
Month |
No of Invoices (1) |
55. Invoice (for Final
Payment) summary (Consultant wise) for given period month wise
|
Consultant name |
Branch |
|
From month: |
To month: |
|
Month |
No of Invoices (1) |
56. Invoice (for Final
Payment) summary for given period month wise
|
From month: |
To month: |
|
Month |
No of Invoices (1) |
57. Invoice (for Final
Payment) summary date wise for given period
|
From date: |
To Date: |
|
Date (Reverse Chronologically) |
Invoice number |
58. Invoice (for Final
Payment) summary (consultant wise) for given period
|
Consultant Name |
Branch |
|
From date: |
To Date: |
|
Date (Reverse Chronologically) |
Invoice number |
59. Out of pocket Expense
Invoice Client wise
|
Client Name |
SON |
Consultant |
Email |
OOP Expense Invoice |
Tel |
Payment Received |
Balance out standing |
|
Inv. NO |
Date |
Value |
Cheque No. |
Date |
|||
60. Out of pocket Expense
Total
|
OOP Expense Invoice |
SON |
Client |
Vacancy |
|
Value Amt. |
Date |
Inv. No |
|
61. Client List on order value
for a given period
|
Client list for the period
from |
|
|
From Date: |
To Date: |
|
Sr. No. |
SON |
**(Inclusive of advance payment +
progressive payment + Final payment)
62. Client List on order value
for a given period (function wise)
|
Client list for the period
from |
|
|
From Date: |
To Date: |
|
Function |
|
|
Sr. No. |
SON |
**(Inclusive of advance payment +
progressive payment + Final payment)
63. Client List on order value
for a given period (Industry wise)
|
Client list for the period
from |
|
|
From Date: |
To Date: |
|
Industry name |
|
|
Sr. No. |
SON |
**(Inclusive of advance payment +
progressive payment + Final payment)
64. Client List on order value
for a given period (Vacancy wise)
|
Client list for the period
from |
|
|
From Date: |
To Date: |
|
Vacancy name |
|
|
Sr. No. |
SON |
**(Inclusive of advance payment +
progressive payment + Final payment)
65. Janam Kundli (client)
It will be a super-menu through
all the related report will be triggered.
66. Janam Kundli (candidate)
It will be a super-menu through
all the related report will be triggered.
|
Candidate History |
|
|
Candidate name |
PEN |
|
Contact details: |
|
|
Residence phone number |
|
|
Email |
|
|
Office phone |
|
|
Mobile number |
|
|
Address |
|
|
Interviews Attended |
|
|
Date of interview (Reverse
chronologically) |
Vacancy name |
|
Resume Sent |
|
|
Date resume sent |
Vacancy name |
* (Short listed / Waitlisted /
Appointed / Rejected)
** (Short listed for preliminary
interview / short listed for final interview / rejected)
67. Executive Placed summary
(Industry Wise) (for a given Period)
|
Industry name |
|
PEN |
68. Executive Placed summary
(Function Wise) (for a given Period)
|
Function |
|
PEN |
69. Executive Placed summary (
Vacancy Wise) (for a given Period)
|
Vacancy name |
|
PEN |
70. Executive Placed summary
(Client Wise) (for a given Period)
|
Client name |
|
PEN |
71. Executive Placed summary
(Joining Date Wise) (for a given Period)
|
Joining Date (Reverse
Chronologically) |
PEN |
Candidate name |
SON |
Client name |
Vacancy name |
Function |
Industry name |
Consultant |
Annual compensation |
72. Executive Placed summary (
Annual Compensation Wise) (for a given Period)
|
Annual compensation
(Descending) |
PEN |
Candidate name |
SON |
Client name |
Vacancy name |
Function |
Industry name |
Consultant |
Joining Date |
73. Executive Placed summary
complete list (for a given Period)
|
Joining Date |
PEN |
Candidate name |
SON |
Client name |
Vacancy name |
Function |
Industry name |
Consultant |
Annual compensation |
74. Analysis of order Executed
Summary (Industry Wise)
|
Period |
|
|
From month: |
To month: |
|
Industry name |
Total no. of orders executed |
|
Total |
\sum |
75. Analysis of order Executed
Summary (Function Wise)
|
Period |
|
|
From month: |
To month: |
|
Function name |
Total no. of orders executed |
|
Total |
\sum |
76. Analysis of order Executed
Summary (Designation Level Wise)
|
Period |
|
|
From month: |
To month: |
|
Designation Level
(alphabetically) |
Total no. of orders executed |
|
Total |
\sum |
77. Analysis of order Executed
Summary (Industry Wise Details)
|
Industry Name |
|
|
From month: |
To month: |
|
Sales Order No. |
Client name |
|
Total |
78. Analysis of order Executed
Summary (Function Wise Details)
|
Function Name: |
|
|
From month: |
To month: |
|
Sales Order No. |
Client name |
|
Total |
79. Analysis of order Executed
Summary (Designation Level Wise Details)
|
Designation Level: |
|
|
From month: |
To month: |
|
Sales Order No. |
Client name |
|
Total |
80. Analysis of order Executed
Summary (Total) for a given period
Tabular form
|
From month / year: |
To month / year: |
|
Sales Order No. |
Client name |
|
Total |
Graphical form
Plot of cumulative percentage of
order value (y-axis) against cumulative percentage of no of orders executed
(x-axis)
81. Out standing Client wise
|
Client Name |
SON |
Consultant |
Email |
OOP Expense Invoice |
Tel |
Payment Received |
Balance out standing |
|
Inv. NO |
Date |
Value |
Cheque No. |
Date |
|||
82. Out standing Consultant
wise
|
Client Name |
SON |
Consultant |
Email |
OOP Expense Invoice |
Tel |
Payment Received |
Balance out standing |
|
Inv. NO |
Date |
Value |
Cheque No. |
Date |
|||
Note:
For the reports the filter for
the records wherever applicable is to be given by the user. The system shall
ask the following parameters wherever applicable and the results will be
filtered based on the same.
- Date from date to date (in DD/MM/YYYY format)
- Company (from company name to company name)
- Division (from division name to division name)
- Branch (from branch name to branch name)
- Consultant (from consultant name to consultant
name)
- Candidate/Client (from respective name to other)
All the reports shall preferably
be produced as print image file. The user shall be provided with the option to
view the report and then print if required.
Applitech Solution Limited
Order Execution System Change Request Form No. 1
|
Project Name |
3P Placement Consultant
Pvt. Ltd. |
|
Project Leader |
Mr. Neeraj Rathi |
|
Changes Referred To |
Functional Specification |
|
Changes Request By |
Client |
|
Changes Authorized By |
Change Request Form
Date: 10/12/2001
|
Change Number |
Change Description |
Priority¹ |
|
1 |
Add an additional field for
Mobile Number where Phone Number is mentioned. |
L |
|
2 |
Add one more text box address 3 |
L |
|
3 |
Date format should be
DD/MM/YYYY |
L |
|
4 |
Keep Pincode Varchar2 |
L |
|
5 |
Use Position Name in the place
of Vacancy Name |
L |
|
6 |
Source should appear along with
PEN. The existing data base gives the information |
M |
|
7 |
The label of these masters
should start with "3P". For example "3P Branch Master" 1)
Company Master 2) Division Master 3) Branch Master 4) Financial Year Master
5) Currency Master |
L |
|
8 |
Edit button should be included |
M |
|
9 |
"Add Mode" will be
default Mode |
L |
|
10 |
Increase the width of Company
Drop down |
L |
|
11 |
Put "Quit" Button on
Login Screen |
M |
|
12 |
PAN should be optional in 3P
Company Master |
L |
|
13 |
Branch Code should not be auto
generated. The field should be of 3 characters with varchar2 |
M |
|
14 |
Put option buttons 3P
Branch/Franchisee in 3P Branch. Labels for four fields should be changed |
L |
¹ High, Medium, Low as defined by
the Client.
Applitech Solution Limited
Order Execution System Change Request Form No. 1
|
Change Number |
Change Description |
Priority¹ |
|
15 |
changed |
M |
|
16 |
Currency Code should not be
Auto Generated User have to enter. varchar2 - length 3 |
L |
|
17 |
Remove currency Short Name |
L |
|
18 |
Change "Currency
Description" to "Remarks" for 3P Currency Master |
L |
|
19 |
Currency Code should be as per
"Reuter" to be fed by user |
- |
|
20 |
Country Code should not be Auto
Generated |
M |
|
21 |
Country Code will be according
to International Code & User have to enter it. Example 091-India &
001 - USA - Varchar2 length 4 |
- |
|
22 |
Industry Code will not be Auto
Generated & User has to enter that code - varchar2 - length 4 |
M |
|
23 |
Designation Code should be Auto
Generated & User has to enter that code. 3 character |
M |
|
24 |
Change "Designation
Description" to "Remarks" |
L |
|
25 |
Remove "Designation
Type" |
L |
|
26 |
Client master: i) Client Master
will be Branch Specific ii) Client Code AHMA0001 Where AHM = Branch Code A to
Z - 4 Digit Number. |
H |
|
27 |
Following Fields will be
Mandatory in client master other than already specified 1) Industry 2) Parent
Group (o) 3) Source of Information |
L |
|
28 |
One field Should be added
"Legal Company Name" in client master |
L |
|
29 |
Function Master: 1) Change
"Functional Description" to "Remarks" 2) Remove Function
Type 3) Put "%" sign behind % fields 4) Function Code will not be
Auto generated |
L |
|
30 |
Ally Master: 1) Add one field
Group Code in table for future expansion of |
M |
Applitech Solution Limited
Order Execution System Change Request Form No. 1
|
Change Number |
Change Description |
Priority¹ |
|
Marketing Module. Field to be
made on screen which is optional. |
||
|
31 |
2) Ally Code is Mandatory and
it will not be Auto Generated 3) Put Following fields: i) Resume Rate
Indicator for Rs / % ii) Charge per Resume Indicator for Rs/% |
L |
|
32 |
Employee Master: 1) Designation
Should be free text and Optional |
L |
|
33 |
Rate Contract Master: 1) Remove
Client's Parent group |
L |
|
34 |
Inquiry Transaction: 1)
Initiator field should be added 2) Replace "Head Hunting" To
"Search" 3) Replace "Data Search" To "Data
Bank" 4) Remove "Position Temporary or Permanent" 5) Remove
"Hours (Full Time)" 6) Remove "Hours (Part Time)" 7) Add
Designation Field in "Resume Forwarding Details" 8) Expected Date
of sending Proposal should be date of Inquiry date + 1 (Ignore Sunday) 9)
Make Following Field Mandatory i) Currency ii) Posting City iii) Country iv)
Contact Person |
M |
|
35 |
Proposal: 1) Add Expected Date
of Response 2) Change "Total Amount" to |
M |
Applitech Solution Limited
Order Execution System Change Request Form No. 1
|
Change Number |
Change Description |
Priority¹ |
|
"Max Amount to be
charged" |
||
|
36 |
3) Make Following fields
optional i) Cost Head ii) Max Amount iii) Activity Phase iv) Particulars v)
Remarks |
|
|
37 |
Proposal Ammendment |
|
|
i) Add Expected Date of
Response |
M |
|
|
ii) Change "Total
Amount" to "Max Amount to be charged" |
||
|
iii) Make Following fields
optional |
||
|
i. Cost Head |
||
|
ii. Max Amount |
||
|
iii. Activity Phase |
||
|
iv. Particulars |
||
|
v. Remarks |
||
|
38 |
Sales Order: 1) Change all
schedule Date from Optional to Mandatory |
L |
|
39 |
Advertising Details: 1) Change
Date of approval to Mandatory |
L |
|
40 |
Candidate Listing: 1) Change
"Preliminary shortlisting" to "Preliminary Interview" 2)
Change "Contact Agency" to "Source which will come from
'Cyrill'!" |
L |
|
41 |
Preliminary Interview Score
Sheet |
H |
|
1) Scoring Pattern should be as
follows: i) Out standing ii) Good iii) Acceptable iv) Not Suitable |
||
|
2) Change "Total Assesment
Score" to "Overall Assessment" |
||
|
3) Following Fields should be
shifted under "Assesment Sheet" |
Applitech Solution Limited
Order Execution System Change Request Form No. 1
|
Change Number |
Change Description |
Priority¹ |
|
i) Strengths |
||
|
ii) Weaknesses |
||
|
4) Remove "Exposure to
ERP" & Contribution to the Organization |
||
|
5) Change "Expected
Joining Date to "Notice Period (In Days)" |
||
|
6) Add Following Fields: i) Car
(Owned/Company/Leased & Confidential Remarks (Which will not be Printed)
should be Added |
||
|
7) 3 Reference should be added.
The details of reference should be |
||
|
i) Name |
||
|
ii) Company |
||
|
iii) Designation |
||
|
iv) Address |
||
|
v) Telephone |
||
|
vi) Mobile |
||
|
vii) Email |
||
|
viii) Fax |
||
|
8) Add "Number of People
Reporting to Him" |
||
|
42 |
Interview Schedule/Reschedule |
|
|
i) Schedule, Reschedule, Print
option should be there. |
||
|
ii) Interview Schedule &
Reschedule Change label "Other Information" to "Detail
Reimbursement" etc. |
||
|
iii) Date/Time should not be
visible to Client |
||
|
43 |
Compensation Detail: 1) All
Salary Details are Optional 2) E should be added 3) Annual Gross (Total * 12) |
L |
|
44 |
Fees Received: 1) Following
should be Mandatory |
L |
Applitech Solution Limited
Order Execution System Change Request Form No. 1
|
Change Number |
Change Description |
Priority¹ |
|
i) Copy of Resignation Letter
Received |
||
|
ii) Copy of Offer Letter
Received |
||
|
iii) Ref Check Done |
||
|
45 |
Prospective Candidate: 1) Add
Following Fields i) Mobile (M) ii) Email(M) iii) Reports to (O) iv)
Designation (O) 2) Remove "Search" - just mode of Search |
L |
|
46 |
Check List for Project Closure:
1) Remarks Should be at Bottom |
L |
|
47 |
Resume Sale: 1) In purpose -
Replace Consultants with Sales Executive 2) Remove Cash from Mode of Receipt
3) Invoice should be Printed (Mentioned in R.C.) 4) Make Following Fields
Optional i) Bank Name ii) Place 5) Add Wire Transfer |
H |
|
48 |
Fee Receipt Detail: 1) Remove
Cash from Mode of Receipt |
L |
|
49 |
All Master will be Company,
Division, & Branch independent only created at H.O. 2) Only Client Master
will be Branch Wise |
H |
|
50 |
Menu entry by client |
H |
Applitech Solution Limited
Order Execution System Change Request Form No. 2
|
Project Name |
3P Placement Consultant
Pvt. Ltd. |
|
Project Leader |
Mr. Neeraj Rathi |
|
Changes Referred To |
Functional Specification |
|
Changes Request By |
Client |
|
Changes Authorized By |
Change Request Form
Date: 10/12/2001
|
Change Number |
Change Description |
Priority¹ |
|
Additional requirements |
||
|
1 |
State Master |
H |
|
2 |
Legal Company Master |
H |
|
3 |
Preliminary Interview order
wise (Report) |
H |
|
4 |
Preliminary Interview Parent
Group wise (Report) |
H |
|
5 |
Parent group wise Bio data sent
(from date to date) (report) |
H |
|
6 |
Parent group wise interview
held (from date to date) (report) |
H |
|
7 |
Ally wise order (report) |
H |
|
8 |
Ally wise bio data sent
(report) |
H |
|
9 |
Send e-mail for reference check |
H |
|
10 |
Regret letters (e-mail) 3 type |
H |
|
11 |
Current status client wise date
wise For which details are as follows: Sales order no Invoice no Date of
invoice Amt. Of invoice Amount received so far TDS amt. Closure Status Reason
for Closure Remarks |
H |
|
12 |
Scheduler (menu screen of
reports as mentioned below which pop up on login by consultant) 1. Inquiry
for which proposal are yet to be sent 2. Proposal which are yet to be
confirmed by client 3. Son's against which min fees are yet to be received |
H |
¹ High, Medium, Low as defined by
the Client.
Applitech Solution Limited
Order Execution System Change Request Form No. 2
|
Change Number |
Change Description |
Priority¹ |
|
received |
||
|
4 |
Sons for which "candidates
short listed" list yet to be sent to client |
|
|
5 |
Sons for which preliminary
screening yet to be completed |
|
|
6 |
Sons for which client still to
conduct "final interview" |
|
|
7 |
Son wise "appointees"
for whom client yet to send com-details |
Advertising Details for a
client (for a given Period)
List of Reports
- Monthly Shopping Basket Summary (for a given
Period)
- Shopping Basket Summary (URL wise)
- Shopping Basket Statement (for a given Period)
- Shopping Basket Designation level wise (vacancy
wise) (for a given Period)
- Shopping Basket (Function wise) for a given Period
- Shopping Basket (Industry wise) (for a given
Period)
- Shopping Basket (Client wise) (for a given
Period)
- Shopping Basket Consultant wise (for a given
Period)
- List of inquiry for a given period
- List of inquiry for a given period (consultant
wise)
- List of inquiry for a given period (Industry wise)
- List of inquiry for a given period (Function wise)
- List of inquiry for a given period (vacancy wise)
- List of inquiry for a given period (City wise)
- List of inquiry for a given period (Country wise)
16. Number of Inquiries remaining
to be answered (consultant wise)
17. List of inquires which did
not convert in to an order (Consultant wise)
18. Inquiry Status (Consultant
wise)
- Proposal
As per format (Ref. SRSPR01)
- Sales Order
Standard letter format to be
given by 3P
- Project Plan for a sales order
- Project Variance for sales Order
23. Pending order for a
consultant chronologically
24. Pending order for a
consultant (client wise)
25. Pending order for a
consultant (Vacancy Name wise)
26. Pending order for a
consultant (Estimated Billing Value wise)
27. Pending order for a client
chronologically
28. Pending order for a client
(consultant wise)
29. Pending order for a client
(Vacancy Name wise)
30. Pending order for a client
(Estimated Billing Value wise)
31. Pending status for a given
period (industry wise)
32. Pending status for a given
period (function wise)
33. Pending status for a given
period (designation level wise)
34. Load on consultant
35. Resumes remaining to be sent
(order wise)
36. Resumes sent out for an order
37. One line statement (for
consultant)
As per Format (Ref. SRSOL01)
38. One line statement (for
client)
As per Format (Ref. SRSOL01)
(This statement will not have the
contact numbers and the agency contact as per the format)
39. Details of prospective
candidate
As per Format (Ref. SRSPC01)
40. Advertising Details for a
client (for a given Period)
41. Advertising response (client
wise) (for a given Period)
42. Advertising response (media
wise) (for a given Period)
43. Interview call sent out for
an order
44. Interview Schedule for Sales
Order
45. Interview held Summary Client
wise
46. Interview held Summary
47. Follow up details for an
order of given client
48. Follow up with candidate (for
a given Period)
49. Client wise Expected date of
joining
50. Details of Compensation
received for an order
51. Compensation details
remaining to be received for an order
52. Compensation Details
As per Format (Ref. SRSCF01)
53. Invoice
As per Format (Ref. SRSIN01)
54. Invoice (for Final Payment)
summary (client wise) for given period month wise
55. Invoice (for Final Payment)
summary (Consultant wise) for given period month wise
56. Invoice (for Final Payment)
summary for given period month wise
57. Invoice (for Final Payment)
summary date wise for given period
58. Invoice (for Final Payment)
summary (consultant wise) for given period
59. Out of pocket Expense Invoice
Client wise
60. Out of pocket Expense Total
61. Client List on order value
for a given period
62. Client List on order value
for a given period (function wise)
63. Client List on order value
for a given period (Industry wise)
64. Client List on order value
for a given period (Vacancy wise)
65. Janam Kundli (client)
It will be a supermenu through
all the related report will be triggered.
- Janam Kundli (candidate)
It will be a super-menu through
all the related report will be triggered.
- Executive Placed summary (Industry Wise) (for a
given Period)
- Executive Placed summary (Function Wise) (for a
given Period)
- Executive Placed summary (Vacancy Wise) (for a
given Period)
- Executive Placed summary (Client Wise) (for
a given Period)
- Executive Placed summary (Joining Date Wise) (for a
given Period)
- Executive Placed summary (Annual Compensation Wise)
(for a given Period)
- Executive Placed summary complete list (for a given
Period)
- Analysis of order Executed Summary (Industry Wise)
- Analysis of order Executed Summary (Function Wise)
- Analysis of order Executed Summary (Designation
Level Wise)
- Analysis of order Executed Summary (Industry Wise
Details)
- Analysis of order Executed Summary (Function Wise
Details)
- Analysis of order Executed Summary (Designation
Level Wise Details)
- Analysis of order Executed Summary (Total) for a
given period
Graphical form
Plot of cumulative percentage of
order value (y-axis) against cumulative percentage of no of orders executed
(x-axis)
- Out standing Client wise
- Out standing Consultant wise
Note:
For the reports the filter for
the records is required to be given by the user. The system shall ask the
following parameters wherever applicable and the results will be filtered based
on the same:
- Date from date to date (in DD/MM/YYYY format)
- Company (from company name to company name)
- Division (from division name to division name)
- Branch (from branch name to branch name)
- Consultant (from consultant name to consultant
name)
- Candidate/client (from respective name to other)
All the reports shall preferably
be produced as print image file. The user shall be provided with the option to
view the report and then print if required.
APPLITECH SOLUTION
www.applitechsolution.com
Commerical Offer
Q.No: ASL/BOM/KS/3P-CR/1
February 21, 2001
|
S.No |
Description |
Price (In Indian Rupees) |
|
1 |
Cost estimation for the
additional work as per the Change Request( enclosed) and the generation of
reports ( as per list enclosed) Includes: |
2,83,500.00 |
|
> Scheduler module |
||
|
> Additional work as
mentioned in the Change Request |
||
|
> Reports generation for 92
reports (including 10 reports mentioned in Change Request). List of 82
reports enclosed. |
||
|
Total |
2,83,500.00 |
Rupees Two Lakhs Eighty Three
Thousand and Five Hundred only
Terms and conditions:
Validity: 30 days
Payment Terms:
- 30% along with the amount payable after submission
of Design documents
- 30% along with the amount payable after prototype
submission
- 20% along with the amount payable after project
sign off
Mode of Payment: crossed
Cheque/Demand Draft payable in Mumbai in favor of Applitech Solution Ltd
All other terms and conditions as
given in our offer dated 20^{th} August 2000 for Order Processing Module
For Applitech Solution Ltd
(Signature)
K.Sudhakar
Manager- Sales
V. URGENT HCP NIRMIT
From: neeraj rathi
[neerajr@asl.com]
Sent: Wednesday, January 17, 2001
7:27 PM
To: hcp; nagle; nirmit
Cc: bombay office; Sudhakar K
Subject: Customer Update
I suppose you have refined in
consultation with Mr. Nagle 19/01.
Dear Sir,
We thank you for the courtesy
extended to our team during their visit to your office on 4th & 5th of
January, 2001.
We have stared making changes in
the Functional Specification as per the changes pointed out by you during the
visit of Tapan Shah and Yogesh Patel. Our Functional Specification has gone for
internal review and we will be sending you the revised copy of the same as soon
as it is finalized for your ready reference.
We are doing impact analysis of
the new requirements and the modifications as suggested by you. We will send
the Change Request Form to you along with new estimate and the revised schedule
and will incorporate the changes only after your approval for the same is
received.
While on the subject of New
requirements we would like to inform you of our interpretation/understanding of
Scheduler as per the hand written note given by Mr. HC Parekh on 5th
January, 2001.
For the sake of simplicity the
same is explained stepwise
- The consultant logs in with his login name and
password
- The system validates the same and opens a screen
Titled "Good Morning" & "Alert Statements"
- The screen will show the various Project Plan
Activities/ Stages like Inquiry, Proposal, Sales Order, Advt. Details,
Candidate Listing, Prem. Screening, Resume Dispatch, Interview,
Compensation Details.
- The consultant can select any one of the above
mentioned options.
- Once selected a predefined report, for the option
selected, will be displayed. The relevant list of reports and their
formats has been mentioned in the note given to us.
- These reports will display all the records which
are open as on the system date.
- These reports will help the consultant to determine
the pending works.
- There after the consultant may either view pending
works for another option or enter the main OES system or logout as per his
wish.
During the visit of Tapan Shah
and Yogesh Patel at your Mumbai office the following issues were raised.
- 3P Consultant will do search on Cyrill system and
the search result will be available to OES. To save search result in
Cyrill database 3P consultants have to make Assignment in Cyrill then 3P
consultant will able to save selected candidate from the search result.
Each search result in Cyrill is Assignment based, so to access particular
search result OES will need Assignment Name that should be unique
for each assignment. 3P
Consultants have to make Assignment in Cyrill whose name will be equal to SON
(which is generated by OES). After Assignment is saved and search is completed,
OES will access relevant table of Cyrill to access data. For this OES should
have access to relevant tables of Cyrill database.
Note : In Cyrill, there is no
constraint for duplicate Assignment Name i.e., Consultant can make more than
one assignment whose names are equal. If 3P consultants make more than one
assignment of one SON then all the search result will be merged in OES system.
- Cyrill system is of client server architecture. The
database of Cyrill lies at 3P Consultants Pvt. Ltd.- Marol Branch. OES
system has web based architecture. The database of OES will be on Web
server. To access Cyrill database from OES following will be requited :
- Cyrill database must be available at all times.
- Cyrill database must have fixed IP address.
Please specify strategy for
same, as this is very crucial requirement for OES.
- To access mails of Shopping Cart, OES will need
dedicated mail account at SMTP mail server of the OES web server. In
present situation all the Shopping Cart mails goes to
nirmit@bom3.vsnl.net.in, as decided Net Administrator of 3P will forward
Shopping Cart Mails to OES mail account.
Please look in to these issues,
as these issues would affect the development and the integration of the system
during implementation. Tapan and Yogesh have already pointed out these issues
to Mr. Nagle over the Phone during their visit. Please look in to these
points and revert back to us as soon as possible.
YOU ARE REQUESTED TO CONFIRM YOUR
UNDERSTANDING OF THE SCHEDULER TOMORROW ITSELF SO THAT THE CHANGE MAY BE
FINALIZED AT THE EARLIEST.
Warm Regards,
Neeraj Rathi
FROM: APPLITECH SOLUTION PHONE
NO.: 91796569489 Aug. 07 2000 07:23 PM P1
HCP Nirmit/CMT/Mitchell
What we will ultimately get out
of the Order Execution Module, depends directly on our own, deep, involvement
with Applitech team. Not only we have to be very clear what we want the system
to deliver, but we have to give that in writing to Applitech - and FAST.
Kind attention: Mr. Hemant Parekh
/ Mr. Nirmit Parekh
Dear Sir,
We once again wish you a Happy
New Year.
This has reference to our letter
dated 20/10/2000 and your subsequent reply dated 30/10/2000. We are a bit
concerned after having gone through your reply, and in the interest of project,
I would like to share the same with you.
Your reply dated 30/10/2000
unfortunately did not contain the answer to most of our questions we had raised
in our letters. I am sure you realise that these are extremely important and
urgent for us, as they affect all the points mentioned below:
- Architecture Information - Mr. Nagle will give
- Freezing of requirements (without which tools can
not be started)
- Selection of appropriate tool (without which
designing can not start)
- Design (Without which development cannot take
place)
- Completion of project as per agreed time line.
I am still awaiting feedback
from CMT/Mitchell
We have received your feedback on
the reports but it lacks the following:
- Suggestions on the content and the data fields (if
any fields have to be added/ deleted)
- Feedback on Sorting order for each report
- Sample data
- The formats of the reports like janam kundli etc.
as requested in report formats send to you (reports nos. 27, 42, 43)
- Details if a report is to be Printed or not along
with frequency etc. (last page of the report format document dated
18/10/2000)
We appreciate your efforts in
grouping these reports logically and will certainly find these effort valuable,
but the above points definitely requires more attention and priority, at this
point of time.
We have also not received any
feedback on the MOM dated 14/10/00 sent along with the report formats. Your
special attention is drawn towards the following points:
- The complete matter of the standard letters to be
given by 3P latest by 25/10/2000. (Point no5) CMT was to send to Tapan
- Format of the checklist to be given by 3P latest by
15/10/2000. (Point no13)
- Format of the Shopping Basket to be given latest by
3P by 15/10/2000. (Point no 14)
We regret to inform that as of
this date we are already slipping the deadline by almost a month &
non-availability of the above will only delay the project further.
Sir, I am sure you have faith in
our capabilities and that's why you have chosen us for your requirement of an
OES. We take great pride in following our ISO 9001 practices. Therefore in
keeping with these streamlined processes, we require all the information to
carry out our activities.
Aug. 07 2000
Your suggestions are always
welcome, we will always revert back on the same, but we would appreciate if you
can answer our immediate queries on priority. In fact we are already checking
and revising the requirement catalogue based on your feedback vide your letter
dated 30/10/2000.
Your additional inputs such as
Amazon.com write-up are indeed enlightening, but we are not in position to
really commit on any of those features for our system. In case we find
something suited to our needs, we will gladly incorporate any good ideas.
In the end we once again request
you to kindly revert immediately on the above-mentioned points since the
project work is at a standstill in absence of the feedback on the same.
I am sure you understand and will
extend your fullest co-operation.
Assuring you of our best services
always.
Warm regards,
For Applitech Solution Ltd.
(Signature)
Neeraj Rathi
Applitech Solution Ltd. 3 P
Consultants P Ltd.
MINUTES OF MEETING
|
Date 14/10/2000 |
Place: 3P Consultants P
Ltd., Mumbai. |
|
3P Consultants P Ltd. (3P) |
Applitech Solution Ltd.
(ASL) |
|
Mr. Hemant Parekh |
Mr. Tapan |
|
Mr. Nirmit Parekh |
Mr. Jayant |
|
Ms. Michelle |
|
|
Mr. Nagle |
|
|
Mr. Cyrill |
The following were discussed and
decided upon:
- 3P will give the PEN No. along with inquiry details
in the format as requested by ASL which will be used by ASL for candidate
listing in the Order Execution System (OES).
- The existing database is being changed and the new
database prepared by 3P will be given to ASL by 1^{st} week of November.
The OES will use the data as captured in the existing/revised database as
and when required.
- The list of standard reports is to be given by 3P
by 15/10/2000.
- The list of standard letters is to be given by 3P
by 15/10/2000.
- The complete matter of these reports & letters
will be given by 3P by 25/10/2000.
- The IT related industry names shall be incorporated
in single industry master.
- Designation master is not required. It has been
brought to the notice of 3P that subsequently it would not be able to
search on this criterion.
- Function master will include the IT functions.
- City master is not required. It has been brought to
the notice of 3P that subsequently it would not be able to search on this
criterion.
- Reasons for rejection of proposal are to be given.
- 3P to give the format of the invoice.
- The OES will give the information of the Candidates
selected to the existing data base of 3P.
- Format of the checklist to be given by 3P by
15/10/2000.
- Format of the Shopping Basket to be given by 3P by
15/10/2000.
- Service Master & the Product Master are not
required.
Applitech Solution Ltd. 3 P
Consultants P Ltd.
- Rate contract will only be a Text document, which
would be available at the time of making the proposal.
- The % of the alliance partners is not being
captured anywhere and the same has to be captured. The input form of this
has to be decided.
- All communications with 3P will carry the Sales
Order Number. There will be no communication with 3P without the Sales
Order Number.
- As the scope of the work has changed the effort for
the development of the order execution system has to be re-estimated. This
also leads to changes in the original project schedule. This will also
have commercial implication which will be discussed with you by our
marketing team.
|
Accepted for & on
behalf of 3 P Consultants P Ltd. |
Accepted for & on
behalf of Applitech Solution Ltd. |
|